Samsung Electronics Co SFG-D1100 5G Outdoor CPE User Manual Installation Manual

Samsung Electronics Co Ltd 5G Outdoor CPE Installation Manual

Contents

Installation Manual

    Radio Access Network  5G CPE Outdoor Installation Manual   Describes product installation and requirement procedure. Document Version 1.0 December 2017      Document Number: TBA
  © 2018 SAMSUNG Electronics Co., Ltd. All Rights Reserved. The contents of this document/presentation contain proprietary information that must be kept confidential. No part of this document shall be photocopied, reproduced, stored in a retrieval system, or transmitted, in any form or by any means whether, electronic, mechanical, or otherwise without the prior written permission of SAMSUNG Electronics Co., Ltd.  No warranty of accuracy is given concerning the contents of the information contained in this publication. To the extent permitted by law no liability (including liability to any person by reason of negligence) will be accepted by SAMSUNG Electronics Co., Ltd., its subsidiaries or employees for any direct or indirect loss or damage caused by omissions from or inaccuracies in this document. SAMSUNG Electronics Co., Ltd. reserves the right to change details in this publication without notice.                   SNMTC-v3-0312  This manual should be read and used as a guideline for properly installing and/or operating the product. Owing to product variations across the range, any illustrations and photographs used in this manual may not be a wholly accurate depiction of the actual products you are using. This manual may be changed for system improvement, standardization and other technical reasons without prior notice. Samsung Networks documentation is available at http://www.samsungdocs.com
Confidential 5G CPE Outdoor Installation Manual   v1.0   iii Copyright ©  2018, All Rights Reserved. Contents Preface  vi Conventions in this Document ........................................................................................................ vi New and Changed Information ...................................................................................................... vii Revision History .............................................................................................................................. vii Organization of This Document ..................................................................................................... vii Related Documentation ................................................................................................................. vii Personal and Product Safety .......................................................................................................... viii Equipment Markings ....................................................................................................................... xii Chapter 1 Before Installation  1 System View and External Interface ................................................................................................ 1 CPE Outdoor View ........................................................................................................................ 1 CPE Outdoor External Interface ................................................................................................... 3 Specifications ................................................................................................................................... 4 Cautions for Installation ................................................................................................................... 5 Before Installing ........................................................................................................................... 5 While Installing ............................................................................................................................ 5 After Installing ............................................................................................................................. 5 Installation Tools .............................................................................................................................. 7 Chapter 2 Installing System  9 Installation Procedure ...................................................................................................................... 9 System Arrangement ..................................................................................................................... 10 Transporting and Unpacking .......................................................................................................... 11 Bringing in Items ........................................................................................................................ 11 Unpacking Items ........................................................................................................................ 11 Fixing System .................................................................................................................................. 12 Fixing Unit Bracket Assembly ..................................................................................................... 12 Fixing System on a Pole Type ..................................................................................................... 13 Fixing System on a Wall Type .................................................................................................... 17 Chapter 3 Inspect the Installation  23 Appendix A Acronyms  27 Appendix B Standard Torque  28
Confidential 5G CPE Outdoor Installation Manual   v1.0   iv Copyright ©  2018, All Rights Reserved. List of Figures Figure 1.  CPE Outdoor View ............................................................................................................................ 1 Figure 2.  CPE Outdoor View(include Cable Cover) .......................................................................................... 2 Figure 3.  CPE Outdoor External Interface ....................................................................................................... 3 Figure 4.  Procedure to Install the CPE Outdoor .............................................................................................. 9 Figure 5.  CPE Outdoor Arrangement Pole type Installation.......................................................................... 10 Figure 6.  CPE Outdoor Arrangement Wall type Installation ......................................................................... 10 Figure 7.  Fixing Unit Bracket Assembly(1) ..................................................................................................... 12 Figure 8.  Fixing Unit Bracket Assembly(2) ..................................................................................................... 13 Figure 9.  Fixing Mounting bracket on the Pole (1) ........................................................................................ 14 Figure 10.  Fixing Mounting bracket on the Pole (2) ........................................................................................ 15 Figure 11.  Fixing Mounting bracket on the Pole (3) ........................................................................................ 16 Figure 12.  Fixing CPE Outdoor on the Pole Mounting Bracket ....................................................................... 17 Figure 13.  CPE Outdoor Marking Dimensions for Wall Type .......................................................................... 18 Figure 14.  Marking Wall Type ......................................................................................................................... 19 Figure 15.  Fixing Mounting Bracket on a Wall (1) ........................................................................................... 21 Figure 16.  Fixing Mounting Bracket on the Wall(2) ........................................................................................ 21 Figure 17.  Fixing CPE Outdoor on the Wall  Mounting Bracket ...................................................................... 22 Figure 18.  Installation Inspection Procedure .................................................................................................. 23
Confidential 5G CPE Outdoor Installation Manual   v1.0    v Copyright ©  2018, All Rights Reserved. List of Tables Table 1.  Specifications ................................................................................................................................... 4 Table 2.  Basic Installation Tools ..................................................................................................................... 7 Table 3.  Parts and Tools for Fixing Unit Bracket on CPE Outdoor ............................................................... 12 Table 4.  Parts and Tools for Fixing Mounting bracket on the Pole .............................................................. 13 Table 5.  Parts and Tools for Fixing CPE Outdoor on the Pole ...................................................................... 16 Table 6.  Tools for Marking ........................................................................................................................... 17 Table 7.  Tools for Drilling ............................................................................................................................. 19 Table 8.  Anchor Bolt Drill Bits and Hole Depth ............................................................................................ 19 Table 9.  Drilling Example ............................................................................................................................. 20 Table 10.  Parts and Tools for Fixing Mounting Bracket on the Wall .............................................................. 20 Table 11.  Parts and Tools for Fixing CPE Outdoor on the Wall ...................................................................... 22 Table 12.  Construction Situation Checklist .................................................................................................... 24 Table 13.  Standard Torque Value for Fastening Bolts ................................................................................... 28 Table 14.  Brass Bolts Torque Value................................................................................................................ 28 Table 15.  Connector Connection Torque Value ............................................................................................. 28
Confidential 5G CPE Outdoor Installation Manual   v1.0   vi Copyright ©  2018, All Rights Reserved. Preface This manual describes how to install a 5G CPE Outdoor and how to connect its cables. This manual includes the following 5G CPE Outdoor:  CPE Outdoor Conventions in this Document Samsung Networks product documentation uses the following conventions.  Symbols Symbol Description     Indicates a task.     Indicates a shortcut or an alternative method.  Provides additional information.  Provides information or instructions that you should follow to avoid service failure or damage to equipment.  Provides information or instructions that you should follow to avoid personal injury or fatality.  Provides antistatic precautions that you should observe. Menu Commands menu | command This indicates that you must select a command on a menu, where menu is the name of the menu, and command is the name of the command on that menu.  File Names and Paths These are indicated by a bold typeface. For example: Copy filename.txt into the /home/folder1/folder2/bin/ folder. User Input and Console Screen Output Text Input and output text is presented in the Courier font. For example, context <designated epc-context-name> CLI commands are presented in bold small caps. For example, Type the RTRV-NE-STS command in the input field.
Confidential   Preface 5G CPE Outdoor Installation Manual   v1.0    vii Copyright ©  2018, All Rights Reserved. New and Changed Information The following table describes information that has been added/changed since the previous publication of this manual. Change Type Change Description   Revision History The following table lists all versions of this document.  Document Version Publication Date Remarks 1.0 February 2018 First version Organization of This Document Section Title Description Chapter 1 Before Installation This chapter introduces CPE Outdoor and describes items should be understood before installation. Chapter 2 Installing System This chapter describes the procedures to install the CPE Outdoor. Chapter 3 Connecting Cables This chapter describes the procedures to connect the cables to the CPE Outdoor installed. Chapter 4 Inspect the Installation This chapter describes the procedures of inspecting installation status after CPE Outdoor installation and cabling is completed. Appendix A Acronyms This annex describes the acronyms used in this manual. Appendix B Clean the Optical Connectors This annex describes the procedure of cleaning the optical connector and cleaning tool. Appendix C Standard Torque This annex describes the standard torque when fastening the bolt. Related Documentation  5G RAN System Description
Confidential   Preface 5G CPE Outdoor Installation Manual   v1.0    viii Copyright ©  2018, All Rights Reserved. Personal and Product Safety This product safety information includes European directives, which you must follow. If these do not apply in your country, please follow similar directives that do apply in your country. Proposition 65 Warning (US Only) State of California Proposition 65 Warning (US only)  WARNING: This product contains chemicals known to the State of California to cause cancer and birth defects or other reproductive harm. Electrical The product is designed to operate from a -48 V DC supply and is therefore classified as Safe Extra Low Voltage (SELV) equipment. All structural parts are grounded and all input and outputs have built-in isolation from the network. All input and output ports that connect to external power sources are designed to meet relevant national safety requirements. The product contains hazardous energy levels as defined by EN 60950. Care must be taken when maintaining this equipment as injury to personnel or damage to the equipment could result from mistakes. Maintenance should only be carried out by trained and competent engineers who are familiar with the relevant procedures and instructions. Lasers The product is fitted with optic modules rated as Class 1 radiation-emitting devices under EN 60825-1. During installation, operation, and maintenance, never look into the end of an optical fiber directly or by reflection either with the naked eye or through an optical instrument. Do not operate equipment with exposed fiber connectors-cover these with fiber cables or blanking caps. Do not remove equipment covers during operation unless requested to do so in the documentation. Carry out normal safety precautions when trimming fibers during installation. Manual Handling Care should be taken when handling equipment. Give due consideration to the weight of the equipment, the physical capability of the individual(s) handling the equipment, and movements such as twisting, bending and stooping, which could lead to skeletal and muscular injuries. Installation Installation must be carried out by trained and competent engineers only. All relevant safety measures should be taken to ensure equipment is not connected to
Confidential   Preface 5G CPE Outdoor Installation Manual   v1.0   ix Copyright ©  2018, All Rights Reserved. live power and transmission sources during installation. Equipment must be correctly installed in order to meet the relevant safety standards and approval conditions. Each power feed to the unit requires a separate fused feed from the provided power supply. The cable between the power distribution point and the installed equipment must have a minimum cross-sectional area of 2.5 mm2. Rack-mountable equipment must be placed in a standard 19-inch rack and secured with the appropriate fixings as detailed in the installation manual. Maintenance Maintenance must only be carried out by a suitably trained and competent technician. All safety instructions must be carefully observed at all times. Equipment covers should not be removed while live power and transmission is connected unless in a controlled environment by trained technicians. Fire The product is powered from a -48 V DC supply. To protect against fire, the equipment is fused.  Environment The product must be operated in an environment with the specified relative humidity and ambient temperature ranges.  Keep all liquids away from the equipment as accidental spillage can cause severe damage. Cooling The product cools down by its own set of cooling fans housed in a fan module. Each fan module detects a fan that is not operating normally. LEDs on the front panel of the fan module provide an alarm indication in the event of fan failure.  In the event of fan failure, take urgent remedial action to restore full cooling capacity. Take appropriate measures to ensure that fan modules do not start spinning during repair and maintenance procedures. Anti-Static Precautions The circuit boards and other modules in the product are sensitive to and easily damaged by static electricity. If any card or sub-assembly is removed from the unit, the following anti-static precautions must be observed at all times:  Service personnel must wear anti-static wrist straps.  Circuit boards and sub-assemblies must be placed on ground conductive mats
Confidential   Preface 5G CPE Outdoor Installation Manual   v1.0    x Copyright ©  2018, All Rights Reserved. or in conductive bags.  All tools must be discharged to ground before use.  The anti-static wrist strap and cord must be checked at regular intervals for their suitability for use. Grounding To comply with EN 60950, the equipment must be connected to a safety grounding point via a permanent link. Grounding points are located on the product for this purpose. Always connect the ground cable before fitting other cables. The product must remain grounded continuously unless all connections to the power supply and data network are all removed. If equipment is grounded through a cabinet or rack, make sure it is done so properly according to the installation instructions. Power Supply Connection The equipment is designed to be powered from a -48 V DC supply. Power connections and installation of associated wiring must be carried out by a suitably qualified technician. Only devices that comply with all relevant national safety requirements should be connected to the unit’s power supply inlets. Other usage will invalidate any approval given to this equipment. Connection of this equipment to devices that are not marked with all relevant national safety requirements may produce hazardous conditions on the network. When the power supply is obtained by a rectifier/safety isolation transformer, the supply must meet the requirements of EN 60950 providing double/reinforced insulation between hazardous voltages and SELV/TNV circuits. Any battery must be separated from hazardous voltages by reinforced insulation. Indirect Connection Before indirectly connecting any equipment to another device through a shared power supply, ALWAYS seek advice from a competent engineer. Devices that are not marked according to the relevant national safety standards may produce hazardous conditions on the network. Product Disposal To reduce the environmental impact of products, Samsung has joined WEEE compliance activities. The WEEE symbol on the product indicates that the product is covered by the European Directive 2002/96/CE for the disposal of Waste Electrical and Electronic Equipment (WEEE). This means that the product should be disposed of separately from the municipal waste stream via designated collection facilities appointed by
Confidential   Preface 5G CPE Outdoor Installation Manual   v1.0   xi Copyright ©  2018, All Rights Reserved. the government or the local authorities. This will help prevent potential negative consequences for the environment and human health. Please check the terms and conditions of the purchase contract for information about correct disposal. Battery Disposal The product contains a battery on the processor card. The battery should not be disposed of with other household waste. Where marked, the chemical symbols Hg, Cd or Pb indicate that the battery contains mercury, cadmium or lead above the reference levels in EC Directive 2006/66. The battery incorporated in this product is not user replaceable. For information on its replacement, please contact your service provider. Do not attempt to remove the battery or dispose it in a fire. Do not disassemble, crush, or puncture the battery.  End of life recycling materials information is available from Samsung. California USA Only This Perchlorate warning applies only to primary CR (Manganese Dioxide) Lithium coin cells in the product sold or distributed ONLY in California USA ‘Perchlorate Material-special handling may apply, See www.dtsc.ca.gov/hazardouswaste/perchlorate.’
Confidential   Preface 5G CPE Outdoor Installation Manual   v1.0    xii Copyright ©  2018, All Rights Reserved. Equipment Markings  This marking on the product, accessories or literature indicates that the product and its electronic accessories (e.g. charger, headset, USB cable) should not be disposed of with other household waste at the end of their working life. To prevent possible harm to the environment or human health from uncontrolled waste disposal, please separate these items from other types of waste and recycle them responsibly to promote the sustainable reuse of material resources. Household users should contact either the retailer where they purchased this product, or their local government office, for details of where and how they can take these items for environmentally safe recycling.  Business users should contact their supplier and check the terms and conditions of the purchase contract. This product and its electronic accessories should not be mixed with other commercial wastes for disposal.   Correct disposal of batteries in this product (Applicable in countries with separate collection systems.)  The marking on the battery, manual or packaging indicates that the battery in this product should not be disposed of with other household waste. Where marked, the chemical symbols Hg, Cd or Pb indicate that the battery contains mercury, cadmium or lead above the reference levels in EC Directive 2006/66.  The battery incorporated in this product is not user replaceable. For information on its replacement, please contact your service provider. Do not attempt to remove the battery or dispose it in a fire. Do not disassemble, crush, or puncture the battery. If you intend to discard the product, the waste collection site will take the appropriate measures for the recycling and treatment of the product, including the battery.   Protective earth CPE Outdoor should be grounded.
Confidential 5G CPE Outdoor Installation Manual   v1.0    1 Copyright ©  2018, All Rights Reserved. Chapter 1 Before Installation This chapter introduces CPE Outdoor and describes the items that you should know before installation. System View and External Interface This section provides the pictorial view of the CPE Outdoor and its interfaces. CPE Outdoor View Figure below depicts the physical structure of the CPE Outdoor. Figure 1. CPE Outdoor View  [Bottom View] [Top View] [Left View] 10.19 (259) 2.08 (53) Unit: in. (mm) [Right View] [Rear View] [Front View] 6.77 (172)  2.52 (64)
Confidential   Chapter 1 Before Installation 5G CPE Outdoor Installation Manual   v1.0    2 Copyright ©  2018, All Rights Reserved. Figure 2. CPE Outdoor View(include Cable Cover)    [Bottom View] [Top View] [Left View] 13.71 (348.4) 2.08 (53) Unit: in. (mm) [Right View] [Rear View] [Front View] 6.86 (174.4)  2.52 (64)
Confidential   Chapter 1 Before Installation 5G CPE Outdoor Installation Manual   v1.0    3 Copyright ©  2018, All Rights Reserved. CPE Outdoor External Interface Figure below depicts the external interface structure of the CPE Outdoor. Figure 3. CPE Outdoor External Interface     Ground Terminal LAN [Bottom View]
Confidential   Chapter 1 Before Installation 5G CPE Outdoor Installation Manual   v1.0    4 Copyright ©  2018, All Rights Reserved. Specifications Table below lists the main specifications of the CPE Outdoor. Table 1. Specifications Item Specifications Technology  5G (follows Verizon 5GTF's latest version) Operating Frequency 27.5 GHz - 28.35 GHz Channel Bandwidth 100 MHz Operating Bandwidth 100MHz x 8 Carrier Antenna Configuration Integrated Antenna  Data Channel: 2Tx/2Rx    RF chain per Data Channel: 32 RF Output Power 36dBm/Path (EIRP, Antenna Gain: 19dBi ) Power Outdoor: PoE (Midspan) Ethernet Outdoor: RJ45 1 Port   PoE, 100Base-TX or 1000Base-T USB USB 2.0 1 Port Bluetooth BLE4.0 USIM Nano-SIM 1 Port   Replaceable regular SIM   support Class C operating conditions: terminal or a smart card operating at 1,8 V ± 10 % LED Total: 4EA   Power: Green LED   Signal: 3 Color (Green/Amber/Red)   Connection: 3 Color (Green/Amber/Red)   Alarm: 3 Color (Green/Amber/Red) Factory Reset 1EA (Push Button Switch) Operational Temperature Outdoor: -30 to 55 °C Humidity 5% - 90%, non-condensing, not to exceed 30g/m^3 absolute humidity IP rating Outdoor: IP65 EMC FCC Part 15 Subpart B FCC FCC Part 30 (5G RF) Installation  Outdoor: Pole/Wall mounting bracket Warranty Warranty: 1 Year Size(W x D x H) 6.77 in.(172 mm) x 2.08 in.(53 mm) x 10.19 in.(259 mm) Volume < 2.5 L (main frame, excluding bracket) Weight < 2.0 kg (main frame, excluding bracket) Power Consumption < 25 W
Confidential   Chapter 1 Before Installation 5G CPE Outdoor Installation Manual   v1.0    5 Copyright ©  2018, All Rights Reserved. Cautions for Installation Observe the safety instructions described in this section when installing the system. Installation must be done in accordance with the applicable local electric codes. Before Installing  Post warning signs in areas where high-voltage cables are installed.  Post ‘off limit’ signs in areas where accidents are most expected.  Use guardrails or fences to block open areas such as ditches, open roof areas, and scaffolds.  Install the system in the restricted access area. While Installing The system power must be cut off before installing.  Ensure the power switch of power supply is off when installing the system. Installing the system with power switch on may cause system damage or fatal human injury when connecting or disconnecting cables.  Ensure that workers wear protection gloves and goggles to prevent injury from debris while drilling holes in a wall or ceiling.  Do not wear accessories such as watches and rings to prevent electrical shock.   Cover unused ports with a cap. This prevents foreign substances from entering into the unused ports.  To prevent foreign substances, outdoor air, and moisture from entering the cable inlet (including cable gland and conduit), finish the inlet as follows:  Unused inlet: Use the hole finishing materials including cap and rubber packing. Cable-installed inlet: After cable installation, block any space in the inlet with tape, compressed sponge, rubber packing, and silicone. After Installing Remove any debris produced during the work and clean up the installation site.  In the system, the laser beam light runs through the optical cable. The workers must handle the optical cables with care as the laser beam can seriously damage the eyes.
Confidential   Chapter 1 Before Installation 5G CPE Outdoor Installation Manual   v1.0    6 Copyright ©  2018, All Rights Reserved.   Ensure that the workers do not damage installed cables while cleaning the system.  While cleaning the power supply device, take precaution that the device does not come in contact with foreign objects that may cause power failure.
Confidential   Chapter 1 Before Installation 5G CPE Outdoor Installation Manual   v1.0    7 Copyright ©  2018, All Rights Reserved. Installation Tools Table below lists the basic tools needed for installation. The additional tools required for each site need to be identified and arranged during a site survey before starting the installation. Table 2. Basic Installation Tools Number Name Specification Purpose of use 1 Torque Driver  Apply a torque range : 6-22 lbf·in For fastening M3 Screw Apply a torque range : 20-90 lbf·in For fastening M6 SEMS (Hexagon+)  2 Screw Driver Bit  +, Number 2 For fastening M3 Screw +, Number 3 For fastening M6 SEMS (Hexagon+) 3 Screw Driver  +, Number 2 For loosening M3 Screw +, Number 3 For loosening M6 SEMS (Hexagon+) T25H For loosening M5 SEMS 4  T25H For fastening Torx Screw (T25H) 5 Tape Measure  16 ft./150 ft.  Tape measure for length measurement 6 Power Extension Cable  100 ft. Basic tool 7 Level  Normal For horizontality and verticality 8 Hammer Drill  Normal Wall type drilling 9 Concrete Drill Bit  1/4 in. (6 mm) For Plastic Anchor  10 Cable Cutter  0.24-1.26 in. (6-32 mm) Cable cutting 11 Crimping Tool  14 AWG-4 AWG (1.5-16 mm2) Pressure terminal for crimping 12 Wire Stripper  Apply cable thickness: 1.5-6.2 in. (4-16 mm) Cable sheath for removal
Confidential   Chapter 1 Before Installation 5G CPE Outdoor Installation Manual   v1.0    8 Copyright ©  2018, All Rights Reserved. Number Name Specification Purpose of use 13 Nipper  Basic Tool For cutting cable 14 LAN Tool  Basic Tool RJ45 crimper 15 Industrial Scissor  Basic Tool Cutting 16 Knife  Basic Tool Cutting 17 Multi tester  Digital Pocket Tester To measure voltage and current to detect cable disconnection  18 Compass  Normal Check azimuth during installation 19 Heating Gun  50-300°C Shrinking Heat Shrink Tube  20 Hammer  Normal Anchor fixing   The required installation tools may vary depending on the site conditions.  In addition to the basic tools, protractor, ladder, safety equipment, and cleaning tools must also be arranged, considering the site conditions.
Confidential 5G CPE Outdoor Installation Manual   v1.0    9 Copyright ©  2018, All Rights Reserved. Chapter 2 Installing System This chapter describes installation procedure of the CPE Outdoor. Installation Procedure Figure below depicts the procedure to install the CPE Outdoor. Figure 4. Procedure to Install the CPE Outdoor     Foundation Work Unpacking and Transporting  Fixing System  Unpacking Items Bringing in Items Pole Type Wall Type
Confidential   Chapter 2 Installing System 5G CPE Outdoor Installation Manual   v1.0   10 Copyright ©  2018, All Rights Reserved. System Arrangement A minimum distance must be secured around the CPE Outdoor, in each direction for installation and maintenance. Figure below depicts the minimum distance that must be secured for pole type installation of the CPE Outdoor. Figure 5. CPE Outdoor Arrangement Pole type Installation  Figure below depicts the minimum distance that must be secured for wall type installation of the CPE Outdoor. Figure 6. CPE Outdoor Arrangement Wall type Installation  Unit: in. (mm) [Top View] [Front View] ≥ 16 (400)   ≥ 8 (200)   ≥ 8 (200)   W: 6.86 (174.4) H: 13.71 (348.4)      4.88 (124)    ≥ 32 (800)   ≥ 16 (400)   Unit: in. (mm) [Top View] [Front View] ≥ 16 (400)   ≥ 8 (200)   ≥ 8 (200)   W: 6.86 (174.4) H: 13.71 (348.4)      4.88 (124)    ≥ 32 (800)   ≥ 16 (400)
Confidential   Chapter 2 Installing System 5G CPE Outdoor Installation Manual   v1.0   11 Copyright ©  2018, All Rights Reserved. Transporting and Unpacking This section details how to transport the items to the installation place and describes the procedure to unpack cabinets and other components. Bringing in Items Take care of the following at each stage of transportation of the items:  Before moving a system, check storage place for the system and remove obstacles in advance.  When carrying the system:   Fasten the system firmly to the transport vehicle or carrier to prevent damage to the system from a vibration or shock.  Use an elevator to prevent accidents. However, if the system must be carried by people, ensure there are enough people to carry the system.  The system must not be shocked physically.  Care must be taken to protect the system from dust, moisture, and static electricity. Unpacking Items To unpack the items, ensure the following:  The items must be packed until they reach the installation place.   The items are classified in accordance with each job specification and stored at a place that does not interfere with working.  Unpacked systems must be installed immediately. If immediate installation of the systems is not planned, the systems must be stored in the installation place temporarily.  Unpack only external packing, leaving the internal packing in unpacked status.  Unpack the inner packaging after each system is placed on its installation location.  Dispose by-products (packaging waste) in accordance with waste management rules. Do not recycle the by-products.
Confidential   Chapter 2 Installing System 5G CPE Outdoor Installation Manual   v1.0   12 Copyright ©  2018, All Rights Reserved. Fixing System This section details the procedure to fix the CPE Outdoor. Fixing Unit Bracket Assembly  To fix a unit bracket assembly on the CPE Outdoor  1  Ensure that the items mentioned in below table are available. Table 3. Parts and Tools for Fixing Unit Bracket on CPE Outdoor Category Description Parts Unit Bracket Assembly 1 Set Fasteners M5 × L14 SEMS (T25H) 4 EA Recommended Torque Value M5 SEMS 25 lbfin (29 kgf·cm) Working Tools   Torque Driver (20-90 lbfin)   Screw Driver Bit (T25H)   Screw Driver (T25H)  2  Loosen the fixed screw of unit bracket to 0.2 inch on the left/right side as shown in figure below. Figure 7. Fixing Unit Bracket Assembly(1)      Screw(T25H)    0.2 in.    0.2 in.
Confidential   Chapter 2 Installing System 5G CPE Outdoor Installation Manual   v1.0   13 Copyright ©  2018, All Rights Reserved. 3  Fix the unit bracket to the fixing hole of the CPE Outdoor rear using fasteners as shown in figure below. Figure 8. Fixing Unit Bracket Assembly(2)  Fixing System on a Pole Type The CPE Outdoor can be fixed on pole using mounting bracket or chain bracket assembly. This section details both procedures.  To fix a mounting bracket on the pole 1  Ensure that the items mentioned in below table are available. Table 4. Parts and Tools for Fixing Mounting bracket on the Pole  Category Description Parts Mounting bracket 1 EA Fastener Steel Band 2 EA Recommended Torque Value Steel Band Fixing Screw 48.5 lbfin (56.1 kgfcm) Working Tools   Torque Driver (20-90 lbfin)   Screw Driver Bit ('+', Number 3)      M5 SEMS (T25H)    Unit Bracket Assembly     M6 SEMS (T25H)
Confidential   Chapter 2 Installing System 5G CPE Outdoor Installation Manual   v1.0   14 Copyright ©  2018, All Rights Reserved.  The standard of the pole on which the mounting bracket can be attached using steel bands is 35 A to 100 A.  2  Pass the steel band through the fixing hole of the mounting bracket, as shown in figure below.  Figure 9. Fixing Mounting bracket on the Pole (1)    Mounting Bracket Steel Band Pole Size (Diameter) Length of Steel Band 50 A (2.4 in./60.5 mm) 502 mm 65 A (3 in./76.3 mm) 80 A (3.5 in./89.2 mm) 90 A (4 in./101.6 mm) 100 A (4.5 in./114.3 mm) 125 A (5.5 in./139.8 mm)
Confidential   Chapter 2 Installing System 5G CPE Outdoor Installation Manual   v1.0   15 Copyright ©  2018, All Rights Reserved. 3  Place a mounting bracket to the pole and fix the steel band, as shown in figure below.  Figure 10. Fixing Mounting bracket on the Pole (2)     Steel Band  Fixing Screw
Confidential   Chapter 2 Installing System 5G CPE Outdoor Installation Manual   v1.0   16 Copyright ©  2018, All Rights Reserved. 4  Check the level of mounting bracket on the pole and adjust the level, as detailed in figure below. Figure 11. Fixing Mounting bracket on the Pole (3)   When fixing the mounting bracket on the pole, be sure to check the level of bracket. After finishing the installation, adjust the level minutely.   When poor leveling happens, adjust the position of fasteners used to fix the mounting bracket.  To fix the CPE Outdoor on the pole mounting bracket 1  Ensure that the items mentioned in below table are available. Table 5. Parts and Tools for Fixing CPE Outdoor on the Pole  Category Description Parts Fasteners M5 × L14 SEMS (T25H) (Fastened to the unit bracket) 2 EA Recommended Torque Value M5 SEMS 25 lbfin (29 kgf·cm) Working Tools   Screw Driver Bit (T25H)   Torque Driver (20-90 lbf·in)  2  Hang the fasteners over the top groove of the pole mounting bracket, and then fix it using fasteners. This is depicted in figure below.  If it is level, the bubble of the spirit level is positioned at the center of both lines.
Confidential   Chapter 2 Installing System 5G CPE Outdoor Installation Manual   v1.0   17 Copyright ©  2018, All Rights Reserved. Figure 12. Fixing CPE Outdoor on the Pole Mounting Bracket  Fixing System on a Wall Type An CPE Outdoor can be fixed on wall using a mounting bracket. This section details the procedures for fixing the mounting bracket on the wall and fixing the CPE Outdoor on the bracket.  To mark on the wall 1  Ensure that the items mentioned in below table are available. Table 6. Tools for Marking Category Description Working Tools   Tape Measure    Permanent Maker   Level    M5 SEMS(T25H) Mounting Bracket_Hook Groove   M5 SEMS(T25H) [Left View] [Right View]
Confidential   Chapter 2 Installing System 5G CPE Outdoor Installation Manual   v1.0   18 Copyright ©  2018, All Rights Reserved.  Perform leveling test before drilling by referring to System Leveling, to ensure the positions marked are horizontal or vertical. If the result shows the marked positions are not horizontal or vertical, modify the marking positions.   When the position to place the system is determined, place the system on that position and then mark the positions where anchor bolts are to be fixed. This reduces marking error range. 2  Check the distance between the location for fixing the CPE Outdoor and the anchor bolt hole, as shown in figure below.  Figure 13. CPE Outdoor Marking Dimensions for Wall Type  3  Place the mounting bracket on the fixing location, check the level status using a level, and adjust the level of the bracket assembly.  4  If the level status is normal, mark the anchor bolt holes on the wall. This is detailed in figure below.  Unit: in. (mm)     : Anchor Bolt Hole [Rear View] 2.49 (64)   3.69 (93.8)
Confidential   Chapter 2 Installing System 5G CPE Outdoor Installation Manual   v1.0   19 Copyright ©  2018, All Rights Reserved. Figure 14. Marking Wall Type   To drill the anchor holes 1  Ensure that the items mentioned in below table are available. Table 7. Tools for Drilling Category Description Woking Tools   Hammer Drill   Drill Bit (1/4 inch)   Vacuum Cleaner Table 8. Anchor Bolt Drill Bits and Hole Depth Category Anchor Bolt Drill Bits Hole Depth CPE Outdoor Φ 6 1/4 in. (6 mm) 1.4 in. (35 mm)   2  Drill anchor holes at the marked points. Remove dust from the holes using a vacuum cleaner.  [O] * Remove the debris from the drilled hole. [Anchor Hole Cross Section] 35 mm (1.4 in) [X] 1/4 in. (6 mm) 2.49 (64)    Unit: in. (mm)/   Marking Point   If it is level, the bubble of the spirit level is positioned at the center of both lines. 3.69 (93.8)
Confidential   Chapter 2 Installing System 5G CPE Outdoor Installation Manual   v1.0   20 Copyright ©  2018, All Rights Reserved. Table 9. Drilling Example   To fix the mounting bracket on the wall 1  Ensure that the items mentioned in below table are available. Table 10. Parts and Tools for Fixing Mounting Bracket on the Wall  Category Description Parts Mounting Bracket 1 EA Fastener M4 × L25 PH+ Taptite Screw 4 EA Φ 6 × L30 Plastic Anchor 4 EA Recommended Torque Value M4 PH+ Tapping Screw 13 lbf·in (15 kgfcm) Working Tools   Torque Driver (6~22 lbf·in)   Screw Driver Bit ('+', No. 2)  Hammer Drill Vacuum Cleaner  1/4 in. (6 mm)
Confidential   Chapter 2 Installing System 5G CPE Outdoor Installation Manual   v1.0   21 Copyright ©  2018, All Rights Reserved. 2  Fix the Φ 6 plastic anchors to the holes drilled on the wall. Figure 15. Fixing Mounting Bracket on a Wall (1)   3  Place the Mounting bracket along with the fixed plastic anchors. Figure 16. Fixing Mounting Bracket on the Wall(2)    M4 PH+ Taptite Screw  Mounting Bracket Wall Plastic Anchor
Confidential  Chapter 2 Installing System 5G CPE Outdoor Installation Manual   v1.0   22 Copyright ©  2018, All Rights Reserved.  To fix the CPE Outdoor on the wall 1  Ensure that the items mentioned in below table are available. Table 11. Parts and Tools for Fixing CPE Outdoor on the Wall Category Description Parts Fasteners M5 × L14 SEMS (T25H) (Fastened to the unit bracket) 2 EA Recommended Torque Value M5 SEMS 25 lbfin (29 kgf·cm) Working Tools   Screw Driver Bit (T25H)   Torque Driver (20-90 lbf·in)   2  Hang the fasteners over the top groove of the wall mounting bracket, and then fix it using fasteners. This is depicted in figure below. Figure 17. Fixing CPE Outdoor on the Wall  Mounting Bracket    M5 SEMS(T25H) Mounting Bracket_Hook Groove   M5 SEMS(T25H) [Left View] [Right View]
Confidential 5G CPE Outdoor Installation Manual   v1.0   23 Copyright ©  2018, All Rights Reserved. Chapter 3 Inspect the Installation This chapter describes the procedures to check installation status. Figure below depicts the overall procedure for inspecting the installation status. Figure 18. Installation Inspection Procedure  Inspection Plan Create an inspection sheet per system and select an inspector to set an inspection schedule per site. NO YES Sharing Inspection Results Taking Corrective Actions On-site Inspection Inspection Checklist Inspection Checklist/Corrective Actions Sharing the Results of Corrective Actions and Preparing Preventive Plan Inspection Plan Checking the Results of Corrective Actions
Confidential   Chapter 3 Inspect the Installation 5G CPE Outdoor Installation Manual   v1.0   24 Copyright ©  2018, All Rights Reserved. On-site Inspection and Inspection Checklist The on-site inspection is to perform inspection visually or using instruments for each specification, standard, and installation status, based on the inspection checklist at the site where the system is installed. The inspector must record the results onto the inspection checklist during or after field inspection. Sharing Inspection Results and Taking Corrective Actions The inspector must share the inspection results (inspection checklist and corrective actions) with an installation operator. The installation operator must take the corrective actions, if necessary, after reviewing the requirements. Checking the Results of Corrective Actions The inspector must check if the corrective actions are properly taken. If they are not sufficient, the inspector must ask the installation operator to take the corrective actions again. Sharing the Results of Corrective Actions and Preparing Preventive Plan After the corrective actions are all completed, the inspector must share the results with the installation operator and relevant departments. The inspector must prepare a preventive plan to prevent the same or similar problems from re-occurring. Construction Situation Checklist Table below provides the checklist to check the installation of the CPE Outdoor and other devices. Table 12. Construction Situation Checklist Category Check Items Criteria Result Pass Fail Installing Equipment Appearance of equipment and mechanical parts Equipment damage such as dent, scratch, and crack   Placement of equipment and mechanical parts Maintenance and horizontal/vertical placement   Leveling condition of equipment and mechanical parts Horizontal/vertical status   Validity of status and specifications of fastening bolt, nut, and washer Checking fasteners omission   Compliance with assembly order of fasteners   Compliance with fastening torque value   Insulation status Checking electrical contact between insulators (insulation resistance tester)   Grounding Installation of ground bar Checking the separation of communication/power/lightning
Confidential   Chapter 3 Inspect the Installation 5G CPE Outdoor Installation Manual   v1.0   25 Copyright ©  2018, All Rights Reserved. Category Check Items Criteria Result Pass Fail grounding Cable specification Checking the specification   Cabling Cable damage   Proper installation route   Compliance with the radius of curvature   Cable binding status Binding status   Binding interval   Checking binding materials   Cable connection Assembly condition of a pressure terminal   Fastening condition of a pressure terminal   Checking compliance with fastening torque value   Installation status of cable tag Position   Marking content   Checking tag installation method   Power Installation status of power supply Power supply capacity   Output voltage (tester)   Installation of circuit breaker Checking circuit breaker capacity   Cable specification Checking the specification   Checking the limit distance   Cabling Cable damage   Proper installation route   Compliance with the radius of curvature   Cable binding status Binding status   Binding interval   Checking binding materials   Cable connection Checking cable connection (Pin Map)   Input voltage   Assembly condition of a pressure terminal and connector   Fastening condition of a pressure terminal and connector   Checking compliance with fastening torque value   Installation status of cable tag Position   Marking content   Checking tag installation method   Other data cables Cable specification Checking the specification   Cabling Cable damage   Proper installation route
Confidential   Chapter 3 Inspect the Installation 5G CPE Outdoor Installation Manual   v1.0   26 Copyright ©  2018, All Rights Reserved. Category Check Items Criteria Result Pass Fail Compliance with the radius of curvature   Cable binding status Binding status   Binding interval   Checking binding materials   Cable connection Checking cable connection (Pin Map)   Assembly condition of a connector   Fastening condition of a connector   Checking compliance with fastening torque value   Installation status of cable tag Position   Marking content   Checking tag installation method   Checking tag installation method   Others Reserved ports Checking port cap fastening status   Cable inlet status/Connection of equipment I/O port Checking fastening status (Conduit/Cable Gland)   Cable tray and duct Checking installation status   Status of inside/outside of the equipment and system surrounding area Checking the stocking condition (waste parts, waste materials, and packing materials)   Opinion   ■
Confidential 5G CPE Outdoor Installation Manual   v1.0   27 Copyright ©  2018, All Rights Reserved. Appendix A  Acronyms AC  Alternating Current CPE Outdoor  Access Unit BH  Back Haul DC  Direct Current DL  DownLink GNSS  Global Navigation Satellite System GPS  Global Positioning System MGB  Main Ground Bar PDLC  Polymer Dispersed Liquid Crystal RTN  Return SELV  Safe Extra Low Voltage SEMS  pre-asSEMbled washers and screws S-FTP  Screened-Foiled Twisted Pair TDD  Time Division Duplex UL  UpLink UTP  Unshielded Twisted Pair
Confidential 5G CPE Outdoor Installation Manual   v1.0   28 Copyright ©  2018, All Rights Reserved. Appendix B  Standard Torque When operator fastens the bolt, use the standard torque values provided in tables below to prevent the equipment and bolt from damage and secure by fastening. When the torque value for each connection part is defined already, use the defined value. Table 13. Standard Torque Value for Fastening Bolts Bolt Spec. Torque Value (N·m) Torque Value (lbf·in) Torque Value (kgf·cm) M3 0.63 5.6 6.4 M4 1.5 13 15 M5 2.8 25 29 M6 4.9 43 50 M8 12 110 127 M10 25 217 250 M12 42 372 428 Table 14. Brass Bolts Torque Value Bolt Spec. Torque Value (N·m) Torque Value (lbf·in) Torque Value (kgf·cm) M6 2.9 26 30 M8 6.3 56 64 Table 15. Connector Connection Torque Value Connector Torque Value (N·m) Torque Value (lbf·in) Torque Value (kgf·cm) SMA connector 0.59 5.2 6 TNC connector 0.88 7.8 9 N-type connector 2 17 20 DIN-type connector 25 217 250 4.3-10-type connector 5 44 51   Torque value can be different, defending on the material, characteristic, and specification of the equipment and fastener. Ensure that you check the proper torque value for each specification of the equipment and the fastener.
         5G CPE Outdoor Installation Manual    Document Version 1.0    ©  2018 Samsung Electronics Co., Ltd. All rights reserved.

Navigation menu