Landis Gyr Technology CGR1S2 BLT5 User Manual 12 0230 Exhibit Cover

Landis+Gyr Technology, Inc. BLT5 12 0230 Exhibit Cover

Manual

5015 B.U. Bowman Drive Buford, GA 30518 USA Voice: 770-831-8048 Fax: 770-831-8598Certification ExhibitFCC ID: R7PCGR1S2FCC Rule Part: 15.247ACS Project Number: 12-0230Manufacturer: Landis+Gyr Technology, Inc.Model: BLT5Manual
PROPRIETARY INFORMATION NOTICE: THIS DOCUMENT CONTAINS TRADE SECRETS AND CONFIDENTIAL INFORMATION OF LANDIS+GYR ANDSHALL NOT BE DUPLICATED IN WHOLE OR IN PART OR USED OR DISCLOSED FOR ANY PURPOSE OTHER THAN THAT APPROVED BY LANDIS+GYR.Assembly Instructions, Kit, BLT5Transceiver, MCC, 97-1828Revision HistoryECORevisionDateAuthorCommentsECO-051889 AA 8/20/2012 Robert Johnson Initial ReleaseECO-052962 AB 4/10/2014 Robert Johnson Modifcation to initial Release, added FCC statement
Assembly Instructions, Kit, BLT5, MCC 97-1828 Rev AB Page 2of 4PROPRIETARY INFORMATION NOTICE: THIS DOCUMENT CONTAINS TRADE SECRETS AND CONFIDENTIAL INFORMATION OF LANDIS+GYR ANDSHALL NOT BE DUPLICATED IN WHOLE OR IN PART OR USED OR DISCLOSED FOR ANY PURPOSE OTHER THAN THAT APPROVED BY LANDIS+GYR.CONTENTS1 INTRODUCTION ..................................................................................................................................................................32 REMOVING THE EXISTING BLT3 TRANSCEIVER FROM THE MCC’S ENCLOSER...........................................33 RE-INSTALLING THE UPDATED LAN/WAN BRACKET ASSEMBLY CONTAINING THE UPDATEDBLT5 TRANSCEIVER UNIT INTO THE MCC ENCLOSER..........................................................................................34. FINAL INSTALLATION......................................................................................................................................................45. FCC…………………………………………………………………………………………………………………………………………….4
Assembly Instructions, Kit, BLT5, MCC 97-1828 Rev AB Page 3of 4PROPRIETARY INFORMATION NOTICE: THIS DOCUMENT CONTAINS TRADE SECRETS AND CONFIDENTIAL INFORMATION OF LANDIS+GYR ANDSHALL NOT BE DUPLICATED IN WHOLE OR IN PART OR USED OR DISCLOSED FOR ANY PURPOSE OTHER THAN THAT APPROVED BY LANDIS+GYR.1 Introduction1.1 All MCCs updated in the field requiring replacement of their original BLT3 transceiver to the newlydesigned BLT5 transceiver must also be retro-fitted per the guidelines specified in this procedure.The MCC field update consists of removing the original BLT3 transceiver, and replacing it with thenewly redesigned BLT5 transceiver. After the new BLT5 transceiver has been installed you willalso need to install a new FCC label, part number 23-1401. The new FCC label should be placedon the MCC’s exterior where it will be highly visible. The new FCC, BLT5 Retrofit label can befound in the MCC retro-fit kit, designated as follows: Kit, BLT5 Transceiver, MCC kit, Landis partnumber 45-1828. The bill of materials is listed below.Kit, BLT5 Transceiver, MCC Part number 45-1828item_number item_name quantity23-1127 LABEL,BLANK,UTILITY ID 190-1002 BAG, 9"X12"X.004 CLEAR POLY BAG WITHZIPPER 297-1828 Assembly Instructions, Kit, BLT5 Transceiver, MCC 123-1401 Label, FCC, BLT5 Retrofit 126-1828 T/A, BLT5 Transceiver, MCC 0112. Removing the existing BLT3 transceiver from the MCC’s enclosure2.1 Refer to Landis document part number : 97-2350, MPI, REPACKAGED ASSEMBLYINSTRUCTION, section 3.0 through section 3.8 for details on how to remove the exisiting BLT3transceiver module.2.2. To remove the existing, original BLT3 transceiver, disconnect the antenna cables P/N: 19-0014,LAN/WAN Radio Power Cable assembly P/N 19-2351, and the LAN Data cables P/N: 19-2352.2.3.Losen the LAN/WAN assembly backet’s machine-screw Hex-nuts. The stated Hex-nuts are usedto hold down the LAN/WAN assembly to the inside of the MCC enclosure, then remove theLAN/WAN assembly from the MCC enclosure. Once the LAN/WAN assembly has been pulledfrom the MCC inclosure, losen the hex-nuts used to hold down the original BLT3 transceiverassembly to the LAN/WAN assembly mouting bracket, pull the BLT3 transciever for the LAN/WANmounting bracket assembly, and replace the orignal BLT3 transceiver will the newly redesignedBLT5 transceiver assembly.3. Re-installing the updated LAN/WAN bracket assembly containing theupdated BLT5 transceiver unit into the MCC encloser3.1 Once you have re-fitted the BLT5 transceiver on the LAN/WAN mounting bracket assembly, re-torque the mounting Hex-nuts used to hold the BLT5 assembly to the LAN/WAN mountingbracket, then, re-install the LAN/WAN mounting bracket assembly inside the MCC enclosure, andre-torque the LAN/WAN mounting bracket’s Hex-nuts. The stated Hex-nuts are used to mount theLAN/WAN bracket assembly down to the inside of the MCC enclosure.3.2 On completion of re-installing the LAN/WAN bracket assembly containing the newly added BLT5transceiver you can re-connect the antenna cables P/N: 19-0014, LAN/WAN Radio Power Cableassembly P/N 19-2351, and the LAN Data cable P/N: 19-2352,
Assembly Instructions, Kit, BLT5, MCC 97-1828 Rev AB Page 4of 4PROPRIETARY INFORMATION NOTICE: THIS DOCUMENT CONTAINS TRADE SECRETS AND CONFIDENTIAL INFORMATION OF LANDIS+GYR ANDSHALL NOT BE DUPLICATED IN WHOLE OR IN PART OR USED OR DISCLOSED FOR ANY PURPOSE OTHER THAN THAT APPROVED BY LANDIS+GYR.4. Final Installation4.1 From your MCC retro fit kit contained in a 9”x 12” zip lock bag, remove the new FCC, BLT5Retrofit label, part number 23-1401. Next remove the label’s non-stick backing paper to exposethe adhesive side of the lablel then stick the new FCC label on the outside of the MCC’senclosure. The label should be placed on the enclosure’s painted exterior bottom where it will behighly visible.4.1 The MCC may be returned to service.5. FCCThis product shall comply with the FCC requirements listed in United States CFR Title 47, Part 15.109,15.209 and15.247.The FCC tests should be performed with the meter module in the configuration s close to the typicalfield configuration as possible.

Navigation menu