Itron 100G Utility Meter Transceiver User Manual 100G Installation Guide

Itron, Inc. Utility Meter Transceiver 100G Installation Guide

Instalation Guide Part 1

   Natural Gas Solutions 100G Installation Guide Revision A Natural Gas Solutions
  Identification 100G Installation Guide  -- DRAFT Part number: PUB-0200-001    Revision A    03/07 ERT Part Numbers: ERG-5000-001, ERG-5000-002, ERG-5000-003, ERG-5000-004  Copyright © 2007 Itron, Inc. All rights reserved.  Your company has the right to reproduce this contract document, provided that such reproduction shall be subject to the same use and disclosure restrictions contained in the Confidentiality and Non-Disclosure paragraphs in the Sales Contract.   Applicable Patents U.S. Patent Numbers: TBD Canadian Patent Numbers: TBD   Transportation Classification Itron classifies and ships model 100G ERT modules as a non-hazardous material. The proper shipping name is Lithium Batteries contain in Equipment, Class 9, UN3091, Packing Group II. The Federal Aviation Administration prohibits operating transmitters and receivers on all commercial aircraft. When powered, the 100G ERT module is considered an operating transmitter and receiver and cannot be shipped by air.    WARNING!  Only authorized Itron personnel should attempt repairs on Itron equipment. Attempts to do so by others might void any maintenance contract with your company. Unauthorized service personnel might also be subject to shock hazard on some Itron equipment if removal of protective covers is attempted.   WARNING!  Substitution of components may impair intrinsic safety.   WARNING!  To prevent ignition of flammable or combustible atmospheres, disconnect power before servicing.  Compliance Statement This device complies with Part 15 of the FCC Rules. Operation of this device is subject to the following two conditions:  • This device may not cause harmful interference.  • This device must accept any interference that may cause undesirable operation.  This device must be permanently mounted such that it retains a distance of 20 centimeters (7.9 inches) from all persons in order to comply with FCC RF exposure levels.   Modification and Repairs To ensure FCC compliance and system performance, this device and antenna shall not be changed or modified without the expressed approval of Itron. Any unauthorized modification will void the user’s authority to operate the equipment.  Meter Installation/Removal In the event of malfunction, all repairs should be performed by Itron. It is the responsibility of users requiring service to report the need for service to Itron.  Related Documents Endpoint-Link ERT Programming Guide (TDC-0411)  Trademark Notice ERT and Itron are both registered trademarks of Itron, Inc. All other product names and logos in this documentation are used for identification purposes only and may be trademarks or registered trademarks of their respective companies.  Suggestions If you have comments or suggestions on how we may improve this documentation, send them to TechnicalCommunicationsManager@itron.com. If you have questions or comments about this application, contact Itron Technical Support:          Itron, Inc.  • Mail: Itron, Inc. Attention: Customer Care, 2111 N Molter Road, Liberty Lake, WA  99019 • E-mail: support@itron.com • Phone: 1 800 635 8725
 Natural Gas Solutions 100G Installation Guide  iii   Chapter 1  Getting Started...........................................................................................1 Transmission Modes ...........................................................................................................................1 Specifications ......................................................................................................................................1 Meter Compatibility List.......................................................................................................................2 Chapter 2  American Meter Installation .......................................................................5 Installation Prerequisites .....................................................................................................................5 Materials Supplied by Itron .......................................................................................................5 Materials Supplied By You........................................................................................................5 Replacement Screws......................................................................................................6 Preinstallation Preparations......................................................................................................6 Remove the Existing Index .......................................................................................................6 Assemble the ERT Module .......................................................................................................9 Program the ERT Module .......................................................................................................14 Attach the ERT Module to the Meter ......................................................................................15 Chapter 3  Sensus Meter Installation.........................................................................21 Installation Prerequisites ...................................................................................................................21 Materials Supplied by Itron .....................................................................................................21 Materials Supplied By You......................................................................................................21 Replacement Screws....................................................................................................22 Preinstallation Preparations....................................................................................................22 Remove the Existing Index .....................................................................................................22 Assemble the ERT Module .....................................................................................................24 Program the ERT ....................................................................................................................26 Attach the ERT to the Meter ...................................................................................................27 Chapter 4  Actaris Meter Installation .........................................................................31 Installation Prerequisites ...................................................................................................................31 Materials Supplied by Itron .....................................................................................................31 Materials Supplied By You......................................................................................................31 Replacement Screws....................................................................................................32 Preinstallation Preparations....................................................................................................32 Remove the Index...................................................................................................................32 Assemble the 100G ERT Module ...........................................................................................34 Program the ERT Module .......................................................................................................36 Attach the 100G ERT Module to the Meter.............................................................................37 Attaching the 100G ERT Module to Model 240-1A Meters ....................................................38   Contents
Contents  iv  Natural Gas Solutions 100G Installation Guide
 Natural Gas Solutions 100G Installation Guide  1  The 100G is Itron's latest gas encoder-receiver-transmitter (ERT®) module.  ERT modules are radio-frequency (RF) devices that transmit meter data. The RF meter data can be received by a reading device that is within transmission distance of the ERT. Itron's 100G ERT module has increased output power over legacy gas ERT modules for increased RF transmission distance.  This installation guide shows you how to install the 100G ERT module on meters from a variety of manufacturers. To ensure you have a meter that is compatible with the 100G ERT module, please see the Meter Compatibility List on page 2.   Transmission Modes Once installed, the 100G ERT module has three available transmission modes:  • Fixed Network Mode   In this mode, a 100G ERT module transmits a high-powered RF message every 60 seconds. Output power in this mode is 250 milliwatts or +24dBm; expected battery life is 20 years.  • Mobile and Handheld Mode   In this mode, a 100G ERT module transmits a medium-powered RF message every 15 seconds. Output power in this mode is 10 milliwatts or +10dBm; expected battery life is 20 years.  • (Optional) Hard to Read Mobile and Handheld Mode   In this mode, a 100G ERT module transmits a high-powered RF message every 30 seconds. Output power in this mode is 250 milliwatts or +24dBm; expected battery life decreases to 15 years in this mode, however. The Hard to Read Mobile and Handheld Mode should only be used for 100G ERT modules that are difficult to read under normal conditions, such as modules installed on roof tops or in sub-basements.  An FCC license is not required to read 100G ERT modules.   Specifications The functional and operational specifications for the 100G are listed below.  Functional Specifications  Description Power Source  Two "A" cell lithium batteries Tamper Detection  Tilt tamper and magnetic tamper FCC Compliance  Part 15 certified Industry Canada Compliance  RSS-210 certified Measurement Canada Approval  Yes CHAPTER 1 Getting Started
Chapter 1  Getting Started  2  Natural Gas Solutions 100G Installation Guide  Functional Specifications  Description Intrinsically Safe per  Factory Mutual and UL Class I, Division 1, Groups C and D Product Identification  Numeric and barcoded ERT module type and serial number Construction Materials  Gray polycarbonate back plate with Santoprene® gasket; clear polycarbonate front cover; encapsulated electronics  Operational Specifications  Description Operating Temperatures  -40° to 158° F (-40° to +70° C) Operating Humidity  5 to 95percent relative humidity Program Frequency  908 MHz Transmit Frequency  Spread spectrum 908 to 924 MHz ISM band Data Integrity  Verified in every data message   Meter Compatibility List The following meters are compatible with the 100G. Due to continuous research, product improvements, and enhancements, Itron reserves the right to change this list at any time.  To ensure you have the latest Meter Compatibility list available, contact your Itron representative.   Mfgr.  Model   Desc.  Class   Comments   ERT Type   ERT Part No. American/ Canadian   W75AL    Residential   Aluminum case Meters Only   100G   ERG-5000-001  American/ Canadian   AL-175    Residential   Aluminum case meters only   100G   ERG-5000-001  American/ Canadian   AC-175    Residential   Aluminum case meters only   100G   ERG-5000-001  American/ Canadian   AT-175    Residential   Aluminum case meters only   100G   ERG-5000-001  American/ Canadian   ALC-175    Residential   Aluminum case meters only   100G   ERG-5000-001  American/ Canadian   AT-210    Residential   Aluminum case meters only   100G   ERG-5000-001  American/ Canadian   AL-225   Canada only   Residential   Aluminum case meters only   100G   ERG-5000-001  American/ Canadian   AL-250    Residential   Aluminum case meters only   100G   ERG-5000-001  American/ Canadian   AR-250    Residential   Aluminum case meters only   100G   ERG-5000-001
 Meter Compatibility List Natural Gas Solutions 100G Installation Guide  3  American/ Canadian   AC-250    Residential   Aluminum case meters only   100G   ERG-5000-001  American/ Canadian   AT-250    Residential   Aluminum case meters only   100G   ERG-5000-001  American/ Canadian   AM-250    Residential   Aluminum case meters only   100G   ERG-5000-001  American/ Canadian   AL-310    Residential   Aluminum case meters only   100G   ERG-5000-001  American/ Canadian   AL-350    Residential   Aluminum case meters only   100G   ERG-5000-001  American/ Canadian   AT-350    Residential   Aluminum case meters only   100G   ERG-5000-001  American/ Canadian   AL-425    Residential   Aluminum case meters only   100G   ERG-5000-001  American/ Canadian   AC-630    Residential   Aluminum case meters only   100G   ERG-5000-001  American/ Canadian   5B 225      Residential   Aluminum case  100G   ERG-5000-001  Sensus/Invensys/ Equimeter/ Rockwell   R-175   11 Tooth  Residential   Compatible with 2 foot drive index; 1 foot drive has 24 teeth  100G   ERG-5000-002  Sensus/Invensys/ Equimeter/ Rockwell   R-200   11 Tooth  Residential    100G   ERG-5000-002  Sensus/Invensys/ Equimeter/ Rockwell   RT-200   11 Tooth  Residential    100G   ERG-5000-002  Sensus/Invensys/ Equimeter/ Rockwell   RT-230   11 Tooth  Residential    100G   ERG-5000-002  Sensus/Invensys/ Equimeter/ Rockwell   R-275   11 Tooth  Residential    100G   ERG-5000-002  Sensus/Invensys/ Equimeter/ Rockwell   RT-275   11 Tooth  Residential    100G   ERG-5000-002  Sensus/Invensys/ Equimeter/ Rockwell   R-315   11 Tooth  Residential    100G   ERG-5000-002  Sensus/Invensys/ Equimeter/ Rockwell   250   11 Tooth  Residential    100G   ERG-5000-002  Sensus/Invensys/ Equimeter/ Rockwell  310   11 Tooth  Residential    100G   ERG-5000-002  Sensus/Invensys/ Equimeter/ Rockwell  S-110   11 Tooth  Residential    100G   ERG-5000-002  Sensus/Invensys/ Equimeter/ Rockwell  S-200   11 Tooth  Residential    100G   ERG-5000-002
Chapter 1  Getting Started  4  Natural Gas Solutions 100G Installation Guide  Sensus/Invensys/ Equimeter/ Rockwell  175-S   11 Tooth  Residential    100G   ERG-5000-002  Sensus/Invensys/ Equimeter/ Rockwell  RT-100   18 Tooth  Residential    100G   ERG-5000-004  Sensus/Invensys/ Equimeter/ Rockwell  S-190   11 Tooth  Residential    100G   ERG-5000-002  Sensus/ Invensys/ Equimeter/ Rockwell  S-120   11 Tooth  Residential    100G   ERG-5000-002  Sensus/Invensys/ Equimeter/ Rockwell  T-120   11 Tooth  Residential    100G   ERG-5000-002  Sensus/Invensys/ Equimeter/ Rockwell  T-110   11 Tooth  Residential    100G   ERG-5000-002  Sensus/Invensys/ Equimeter/ Rockwell  R-415   18 Tooth  Residential    100G   ERG-5000-004  Sensus/Invensys/ Equimeter/ Rockwell  RT-360   18 Tooth  Residential    100G   ERG-5000-004  Sensus/Invensys/ Equimeter/ Rockwell  MR8  (R-275 Metric)  16 Tooth  Residential    100G   ERG-5000-003  Sensus/Invensys/ Equimeter/ Rockwell  MR12  (R-415 Metric)  16 Tooth  Residential    100G   ERG-5000-003
 Natural Gas Solutions 100G Installation Guide  5  This chapter shows you how to install a 100G ERT Module on an American meter. Before installing the 100G ERT Module, verify that you have:  • A compatible meter shown in the Meter Compatibility List.  • A compatible index. Itron 100G ERT Modules can be used with standard dial and direct read (odometer) indexes on American Meters.  • The list of materials defined under Installation Prerequisites on page 5 in this chapter  Installation Prerequisites The following items are required to install Itron's 100G ERT Module.   Materials Supplied by Itron The following items are supplied by Itron: • 100G ERT Modules • Tamper plugs.  Materials Supplied By You You must supply the following items to successfully install the 100G ERT Module on the meters listed in the Meter Compatibility List on page 2. • Small and medium flat-blade screwdrivers   Used to remove and tighten index and index-cover screws. • Side-cutting plier/wire snips   Used for cutting wire seals, if necessary. • Small putty knife   Used to remove all traces of old gaskets from the meter.  • Meter seals, wire seals, and seal press   Used to secure the meter from tampering, if necessary. • 11/32-inch nut driver or other blunt tool   Used to securely seat new tamper plugs over screw holes.  • Replacement screws   Used to mount 100G ERT Module assembly to meter and index to module assembly backplates. • FC200SR unit with EndPoint-Link or EndPoint-Link Pro software   Used to program  and check ERT assembly.  CHAPTER 2 American Meter Installation
Chapter 2  American Meter Installation  6  Natural Gas Solutions 100G Installation Guide  Replacement Screws Replacement screws used in this procedure must be slotted, zinc-plated, steel machine screws. Sizing options are shown below.  For mounting 100G ERT Module assemblies on meters: • Use 1/4 - 20 x 5/8-inch slotted, Fillister head screws. For mounting indexes on 100G ERT Module backplates: • Use 8 - 32 x 3/16-inch slotted, round head screws.  Preinstallation Preparations Before installing the 100G ERT Module on a meter, verify that:   • All Itron gas modules are 100G ERT Modules for your brand of gas meters.  • The model numbers of all meters on which the 100G ERT Modules will be installed are included in the Meter Compatibility List.  There are four major steps to installing the 100G ERT Module on a meter:  • Remove the index • Assemble the 100G ERT Module • Program the 100G ERT Module • Attach the 100G ERT Module to the meter. These procedures are described in the following sections.   NOTE   Be sure to properly dispose of all unused screws, old index covers, gaskets, and other left-over materials. Do not leave any materials on customer premises.    Remove the Existing Index The first major step when installing a 100G gas ERT on an meter is to remove the index from the meter.  To Remove the Index 1. Remove any tamper seals from the meter.
 Installation Prerequisites Natural Gas Solutions 100G Installation Guide  7  2. Detach the index cover from the meter by removing the four screws holding it in place.    3. Examine the index cover screws you just removed. Verify that they are 5/8-inch long and are not corroded.  • If the screws are 5/8-inch long, and are not corroded, keep them for later use.  • If the screws are an incorrect length or are corroded, dispose of them properly. Use 1/4 - 20 x 5/8-inch screws as described in Replacement Screws on page 6 instead.   TIP   You can use the index cover you just removed as a temporary storage location for screws.  4. Unscrew one index mounting screw completely.  Hold one hand beneath the index to catch the screw when it falls out of the index assembly. If it does not fall out by itself, be sure to remove it.   5. Unscrew the other index mounting screw.
Chapter 2  American Meter Installation  8  Natural Gas Solutions 100G Installation Guide  While removing this screw, pull the index away from the meter to keep its backplate (1) against the back of the screwhead (2). This prevents the screw from falling out prematurely.  12 6. Remove the screw from the index once it is completely free of its hole.  7. Set the index aside for the moment. Place it where it will not be damaged; get filled with dirt, rain, or snow; or fall to the ground or floor. The index will be used later in this procedure.  8. Examine the index screws you just removed. Verify that they are 3/16-inch long and are not corroded.  • If the screws are 3/16-inch long and are not corroded, keep them for later use.  • If the screws are an incorrect length or are corroded, dispose of them properly. Use 8 - 32 x 3/16-inch screws as described in Replacement Screws on page 6 instead.  9. Use a putty knife or similar object to completely remove the old index gasket from the meter (if applicable). All traces of the gasket must be removed before the ERT can be installed.
 Installation Prerequisites Natural Gas Solutions 100G Installation Guide  9  Assemble the ERT Module When installing a 100G ERT Module, the next major step is to create the endpoint module assembly by combining the endpoint backplate and cover with the meter index. Follow the procedure below to do so.  To Assemble the ERT Module 1. Obtain a new 100G ERT Module. 2. Separate the ERT module backplate (1) from the cover (2).    3. Set the new ERT index cover aside for the moment. Place it where it will not be damaged; get filled with dirt, rain, or snow; or fall to the ground or floor. The ERT index cover will be used later in this procedure.   IMPORTANT  Before continuing with the installation, note the following information about American Meter indexes: • Index wrigglers on one-foot meters have drive slots.
Chapter 2  American Meter Installation  10  Natural Gas Solutions 100G Installation Guide  • Index wrigglers on two-foot meters have drive posts.   • An index may have mounting screw holes.   • An index may have mounting screw slots.   If the index has mounting screw slots, skip steps 4 and 5 below. Continue with step 6.  If the index has mounting screw holes, perform steps 4 and 5 below, and then skip steps 6 and 7.
 Installation Prerequisites Natural Gas Solutions 100G Installation Guide  11  4. If the index has mounting screw holes, place an index mounting screw (1) in the right-hand mounting screw hole (2). Use one 8 - 32 3/16-inch screw for this step (you can use an original mounting screw if it was the correct size and not corroded; otherwise, use the correct size replacement screw).  12 5. Attach the screw to the ERT backplate's right-hand index mounting post just far enough to hold the screw and end of the index in place.   6. If the index has mounting screw slots, screw an index mounting screw (1) one to two turns into the ERT backplate's right-hand index mounting post (2). Use one 8 - 32 x 3/16-inch screw for this step (you can use an original mounting screw if it was the correct size and not corroded; otherwise, use the correct size replacement screw).
Chapter 2  American Meter Installation  12  Natural Gas Solutions 100G Installation Guide   21 7. Place the index mounting screw slot under the screw head. Do not tighten the screw yet.  21 8. Attach the wriggler to the index and backplate.  • If the index wriggler has a drive slot (1), place the backplate wriggler's drive post (2) in the index wriggler's drive slot.  21
 Installation Prerequisites Natural Gas Solutions 100G Installation Guide  13  • If the index wriggler has a drive post (1), place the index wriggler's drive post in the backplate wriggler's drive slot (2).  21 9. Install and tighten the left-hand index mounting screw (for indexes with either mounting screw slots or holes). Use one 8 - 32 x 3/16-inch screw for this step (you can use an original mounting screw if it was the correct size and not corroded; otherwise, use the correct size replacement screw).   10. Tighten the right-hand index mounting screw.  11. Slide the ERT cover (1) over the index and backplate (2).    Next, program the ERT module.
Chapter 2  American Meter Installation  14  Natural Gas Solutions 100G Installation Guide    Program the ERT Module Once the ERT module has been assembled, the ERT must be programmed using the FC200SR with EndPoint-Link software. See the Endpoint-Link ERT Programming Guide (TDC-0411) for more information.    IMPORTANT  You must perform the following programming procedure for the ERT module to function properly.  When programming the ERT module, you must take note of the drive rate shown on the index of American meters. Examples of 1-foot (1) and 2-foot (2) drive rates are shown below (a 0.05 cubic metre drive rate is not shown). Be sure to program the ERT based on the drive rate indicated on the index. 12
 Installation Prerequisites Natural Gas Solutions 100G Installation Guide  15  To Program the ERT Module 1. Using the FC200SR, program the reading of the index that was on the meter into the ERT module assembly.  • For initial programming, hold the FC200SR approximately 1 foot away from the 100G.  • For reprogramming (30 days or more past initial programming), hold the FC200SR approximately 4 to 5 feet away from the 100G.  Be sure to program the 100G to the correct mode for the reading technology what will be used (for example, Fixed Network Mode, Mobile/Handheld Mode, or Hard to Read Mobile/Handheld Mode). In Endpoint-Link Pro v5.0, you will have access to the one mode that was defined by your system administrator.  During programming, the 100G ERT module is programmed to the nearest 100 cubic feet; the last two digits (the tens and units) are programmed as zeros (0). Once programming is complete, however, the ERT module assembly can be read to the nearest cubic foot.  2. Slowly turn the ERT module drive wriggler two turns in the direction indicated on the index drive rate. This lets you verify the ERT module is counting properly after assembly.   IMPORTANT  Do not turn the drive wriggler faster than one turn per second. 3. Read the ERT module assembly using the FC200SR. Consult the EndPoint-Link ERT Programming Guide (TDC-0411) or other applicable instructions for details on how to read an ERT.  • If this reading is higher than the one you programmed in step 1 above, the ERT module assembly is counting correctly.  • If the ERT module assembly reading is not higher than what was programmed in step 1, replace the ERT module with a new one.  Attach the ERT Module to the Meter After the endpoint has been programmed and is reading correctly, it must be attached to the meter. Follow the steps below to do this.
Chapter 2  American Meter Installation  16  Natural Gas Solutions 100G Installation Guide  To Attach the ERT to the Meter 1. 5B 225 Meters Only   If you are installing the ERT on a 5B 225 aluminum meter, cut 1/16-inch off each post of the ERT wriggler to prevent it from rubbing on the face of the nut that holds the wriggler in place. If you are not installing on a 5B 225 meter, continue to step 2 below.   2. Set the wriggler to the desired position for mounting the ERT module assembly to the meter.  • For One-Foot Meters:  Align the ERT module assembly wriggler with the meter drive post (as shown below). Make sure the ERT wriggler is perpendicular to the meter drive post.
 Installation Prerequisites Natural Gas Solutions 100G Installation Guide  17  • For Two-Foot Meters:  Align the ERT module assembly wriggler with the meter drive slot (as shown below).  It is acceptable for the pin on the 100G wriggler to be installed inside or outside of the meter drive slot. For ease of assembly, Itron recommends that the pin on the 100G wriggler be installed outside of the meter drive slot.   3. Gently place the ERT module assembly on the meter. Align the four screw holes on the ERT module assembly with the holes on the meter.
Chapter 2  American Meter Installation  18  Natural Gas Solutions 100G Installation Guide  4. Install and tighten all ERT module assembly mounting screws, working in a diagonal pattern as shown below. Tighten the mounting screws to 15 to 20 inch-pounds of torque. Use the 1/4 - 20 x 5/8-inch screws for this step (you can use the original mounting screws if they were the correct size and not corroded; otherwise, use the correct size Replacement Screws on page 6).  3412 5. Place a new tamper seal over two of the mounting screws as shown below.  12 6. Press the new tamper seals into place using the 11/32-inch nut driver (or another similar blunt tool).   7. Complete any necessary paperwork. Make sure no excess material is left on the customer premises; dispose of it properly.
 Installation Prerequisites Natural Gas Solutions 100G Installation Guide  19  The ERT is now installed on the meter.
Chapter 2  American Meter Installation  20  Natural Gas Solutions 100G Installation Guide

Navigation menu