Huawei Technologies RRU3201-2600M Distributed Base Station Remote Radio Unit User Manual Installation Guide

Huawei Technologies Co.,Ltd Distributed Base Station Remote Radio Unit Installation Guide

Installation Guide

HUAWEI TECHNOLOGIES Co., Ltd.Issue: 01Part Number:Date: 2009-08-10RRU3201 V100R001C01 Installation Guide
1Safety Information …………………………………………….….……Installation Tools ………………………………………….…………..Space Requirements …………………………………….……..…….Installation Modes …………………………………………………….Installation Procedure …………………………………….………….Components Delivered with the RRU ……………………………..Installing the RRU on a Metal Pole ………………..……………….Installing the RRU on a Wall ………………………………………..Installing the RRU on a U-Steel ……………….……….…………..Installing the RRU on an Angle Steel ……………………………..Installing the RRU Cables …………………………………………..RRU Hardware Installation Checklist ……………………………..Powering On the RRU …………………………………...…………..Reference ………………………………………………………..……..Change History …………………………………...…………………..ContentsCopyright © Huawei Technologies Co., Ltd. 2009. All rights reserved.23456671215151623232430
2Copyright © Huawei Technologies Co., Ltd. 2009. All rights reserved.Following All Safety PrecautionsBefore any operation, read the instructions and precautions in this document carefully to minimize the possibility of accidents.The Danger, Caution, and Note items in the documents do not cover all the safety precautions that must be followed. They only provide the generic safety precautions for operations.When operating Huawei products and equipment, you must comply with safety precautions and special safety instructions related to corresponding equipment provided by Huawei. The safety precautions in the document are related to only Huawei products. Huawei is not liable for any consequence that results from the violation of universal regulations for safety operations and safety codes on design, production, and equipment use. Complying with the Local Safety RegulationsWhen operating the device, comply with the local safety regulations. The safety precautions provided in the documents are supplementary. You must comply with the local safety regulations.Qualified Personnel OnlyThe personnel in charge of installation and maintenance must be trained and master the correct operating methods and safety precautions before beginning work.SymbolsSafety of Personnel• The high voltage power supply provides power for running the system. Direct contact with the high voltage power supply or contact through damp objects may result in fatal danger.• Non-standard and improper high voltage operations may result in fire and electric shock.• In a thunderstorm, do not perform operations on high voltage and AC power supply facilities or on a steel tower and mast.• Ground the device before powering on the device. Otherwise, the personnel and device are in danger.• Power off the device before performing operations on the power supply equipment.• High power radio-frequency signals are harmful to human body. Before installing or maintaining an antenna on a steel tower or mast with a large number of transmitter antennas, the operator should coordinate with all parties to ensure that the transmitter antennas are shut down.• When handling optical fibers, do not stand close to, or look into the optical fiber outlet with unaided eyes.• Protect yourself when drilling holes. Flying dust may hurt your eyes or you may inhale the dust.• Power off the batteries before connecting the cables to the batteries. Otherwise, casualties may occur. • When working at a height, be cautious about falling objects.Device Safety• Check the electrical connection of the device before operation and ensure that the device is reliably grounded.• The static electricity generated by the human body may damage the electrostatic sensitive components on the circuit board, such as the large-scale integrated circuit (LIC). Wear an ESD wrist strap or ESD gloves when performing the operation.• When working on batteries, take measures to prevent short circuits in the batteries and electrolyte spill/loss. The electrolyte may erode metal and boards, or even cause rust of the equipment or short circuits in the boards.• When the equipment is unpacked, it must be powered on in 24 hours. The maximum duration of the power-off state of the equipment is 24 hours during maintenance.Safety InformationIndicates a hazard with a high level of risk, which if not avoided,will result in death or serious injury.DANGERWARNINGCAUTIONTIPNOTEIndicates a hazard with a medium or low level of risk, which if not avoided, could result in minor or moderate injury.Indicates a potentially hazardous situation, which if not avoided,could result in equipment damage, data loss, performance degradation, or unexpected results.Indicates a tip that may help you solve a problem or save time.Provides additional information to emphasize or supplement important points of the main text.
3Installation ToolsAdjustable wrench(with the diameter of at least 32 mm)Torque screwdriverMeasuring tapeVacuum cleanerWire StripperLevelMarkerMultimeterClaw hammerESD glovesCombination wrench(21mm~21mm) for pole installationPower cable crimping tool Cable cutterHeat gunHammer drillKnife(17mm~17mm) for pole installationFlat-head screwdriver (M3 to M6)Phillips screwdriver (M3~M6)
4Space Requirements (Unit: mm)abcdRRU DimensionsRecommended Clearance for a Single RRU Minimum Clearance for a Single RRURecommended Clearance for Multiple Centralized RRUs eMinimum Clearance for Multiple Centralized RRUs≥300≥300≥600≥800≥500200300400100600
5Installation ModesOn a metal pole On a wall On an angle steelOn a U-steelMetal pole Angle steel U-steelThe following figures show the installations of multiple RRUs on the metal poles.The RRU can be installed on the tower. For details, see page 24 Lifting the RRU and Installation Components to the Tower.60mm~114mm63mm~80mm63mm ~80mm30mm~50mm50mm~100mm63mm~80mm30mm~50mm2RRU 4RRU 6RRUThe following figure shows the specifications of the metal pole, angle steel, and U-steel where the RRU is installed.zA maximum of two RRUs can be installed on a metal pole with a diameter of 60 mm to 76 mm, and the installation mode must be standard mode. Three or more RRUs must be installed on a metal pole with a diameter of 76 mm to 114 mm in a centralized way. zIt is recommended that only one RRU be installed on a U-steel or angle steel.zWhen installed on a tower, one RRU can be installed only in standard mode or reverse mode rather than side-mounted. Two RRUs cannot be installed in back-to-back mode.
6Installation ProcedureStartEndInstall the RRU on a metal pole(page 7~11)Install the RRU on a wall(page 12~14)Install the RRU on a U-steel(page15)Install the RRU on a angle steel(page15)Install the RRU cables(page16~22)Power on the RRU(page 23)Check the installation(page 23)Components Delivered with the RRUFixture assembly for installing the RRU Front of the RRU Back of the RRUCover plate Attachment plateM10x110 BoltMain fixtureAuxiliary fixtureInstallation ModesThe brackets cannot be combined when the RRUsare installed on the wall.When the RRU is installed on a U-steel or angle steel, the angle between the U-steel or angle steel and the longitudinal direction cannot exceed 10 degrees.installation carrier
7Installing the RRU on a Metal PoleInstalling a Single RRU in Ordinary Modea1. Install the main fixture.2. Install the auxiliary fixture between the nuts of the dual-nut bolt assembly on the main fixture.ArrowDual-nut bolt assembly Ensure that the arrow on the auxiliary fixture is upward.You can fit the auxiliary fixture on one of the dual-nut bolt assemblies before the installation. Thus, you can simply install the auxiliary fixture by fitting the other end of it on the other dual-nut bolt assembly.1. Before installing the main fixture, ensure that the contact piece on the fixture is fixed.2. When installing the main fixture, keep the arrow on the main fixture upward. It is recommended that the bottom of the main fixture be 1200 mm to 1600 mm above the ground for easy maintenance.Fit the auxiliary fixture into the dual-nut bolt assemblies.
8Installing the RRU on a Metal Pole4. Install the RRU on the main fixture.When tightening the nuts, ensure that the two dual-nut bolt assemblies are tightened simultaneously. The fastening torque is 40 N• m.3. Use an adjustable wrench (with the diameter of at least 21 mm) to tighten the dual-nut bolt assemblies. In this way, the main and auxiliary fixtures are securely mounted on the pole.1. When you perform this operation, you need to place the foam pads or paper under the RRU to avoid any damage to the shell.2. The RF port at the bottom of the RRU does not have load bearing capacity. Do not place the RRU on the ground on its bottom during the installation.The screw is a non-fixed one and is for removing the RRU.
9Installing the RRU on a Metal PoleInstalling Two RRUs in Back-To-Back Modeb4. Install the second RRU on the main fixture in reverse mode.2. Install the main fixture of another RRU. Ensure that the main and auxiliary fixtures are perfectly fitted.3. Reinstall the cover plate and attachment plate on the second RRU to interchange their positions.1. Install an RRU first. For details, see page 7 Installing a Single RRU in Ordinary Mode.Ensure that the cabling cavities of the two RRUs face the same direction when installing the RRUs Ordinary mode ReversemodeM6x16torque: 4.7 N.M
10Installing Multiple RRUs in Centralized ModecInstalling the RRU on a Metal Pole4. Install another RRU on the second main fixture.1. Reinstall the attachment plate on the back and cover plate on one side to interchange their positions.2. Install an RRU on a main fixture. 3.Install another main fixture.M6x16torque: 4.7 N.M
11Installing the RRU on a Metal PoleInstalling Multiple RRUs in Centralized Modec5. nstall a third main fixture.6. Install a third RRU on the third main fixture.7. Install a fourth RRU on the main fixture. For details, see step 2 to step 4 on page 9 Installing Two RRUs in Back-To-Back Mode.
1252~60mm90°Ø1420~30mmInstalling the RRU on a Wall1. Place the auxiliary fixture on the wall at the installation position , use a level bar to measure the levelness of the fixture, and then mark the anchor points by using a marking pen.2. Drill holes at the anchor points and then install the expansion bolt assemblies.It is recommended that the bottom of the auxiliary fixture be 1200 mm to 1600 mm above the ground.After the expansion bolt is removed, dispose of the plastic tube.Do not hammer the bolt entirely into the expansion tube, and leave 20 mm to 30 mm of the bolt outside the wall.When RRUs are installed on a wall, the specifications of the wall are as follows: zFor one RRU, the wall has a weight-bearing capacity of 76 kg.zThe fastening torque of the expansion bolt reaches 30 N·m, the expansion bolt works properly, and no damages such as cracks are on the wall. Level barRRUBolt M10x65Flat washer 10Spring washer 10Expansion tubePlastic tube
13Installing the RRU on a Wall3. Fit the auxiliary fixture on the expansion bolts downward, and then tighten the bolts by using a combination wrench (with the diameter of at least 17 mm).4. Install the main fixture.30N•mM10X65Ensure that the arrow on the auxiliary fixture is upward.
14Installing the RRU on a Wall5. Install the RRU.6. Install Multiple RRUs.
15Installing the RRU on a U-SteelThe procedure for installing the RRU on a U-steel is the same as that for installing the RRU on a metal pole.Installing the RRU on an Angle SteelThe procedure for installing the RRU on an angle steel is the same as that for installing the RRU on a metal pole.U-steelAngle steelTop viewTop viewU-Steel
16Installing the RRU CablesRRU Cable ConnectionsaThe RET/MON port on the RRU is multi-functional, and can be installed with either AISG multi-wire cable or alarm cable. When the length of the AISG multi-wire cable is not enough, you can choose the optional AISG extension cable. PGND cableAntenna jumperPower cableCPRI optical cableAISG multi-wire cableAlarm cableAISG extension cableAntennaBBUSingle RRUStandard AISG female connector of the AISG multi-wire cableStandard AISG male connectorStandard AISG male connector of the AISG extension cable or RCUStandard AISG female connectorPort labeled RET/MON on the RRUWaterproof DB9 connectorAISG multi-wire cablePort labeled RET/MON at the bottom of the RRUDB9 male connectorAlarm cableExternal alarm devicesEight cord end terminalsThe connectors labeled 2A and 2B are connected to port labeled CPRI0, CPRI1 or CPRI2 on the LBBP board of the BBU.DLC connectorCPRI optical cableThe connectors labeled 1A and 1B are connected to  the optical module on the port labeled CPRI_W on the RRUDLC connectorAISG extension cable Standard AISG male connector of the RCUStandard AISG female connectorThe blue OT terminal is connected to socket labeled NEG(-)0 in the RRU cabling cavity. And the black OT terminal is connected to socket labeled RTN(+)0.Two OT terminals(M4)Power cableExternal power supplyBare wireFeeder or antennaDIN male connectorPorts labeled ANT_TX/RXA and ANT_TX/RXB on the RRU(Only the ANT_TX/RXA port supports the OOK signal).DIN male connectorAntenna jumperNearest grounding barOT  terminalGrounding bolt on the RRUOT  terminal(M6)PGND cable(16mm2 )Connector to…Connector TypeCableCable ListRCU
17Installing the RRU CablesFor detail information of the cable, see Cable List on Page 17.External power system External monitoring deviceAntennaAntennaAntennaPGND cableAntenna jumperPower cableCPRI optical cableAISG multi-wire cableAlarm cableAISG extension cableMultiple RRURCUbOpen the cover plate of the RRU cabling cavity
18Installing the RRU CablesCCabling Cavity of the RRUWaterproof fillerCover plate of the cabling cavityCabling cavity Cable trough for the power cableCable trough for the optical cabledCable Connections of the RRUGrounding screwOT terminalPGND cableFirst wrap the joint with the waterproof tape, and then wrap the joint with the PVC insulating tape.StrapShielding layer of the power cablePGND cableAntenna jumperPower cableCPRI optical cableAISG multi-wire cable
19Installing the RRU CablesfCable Connections of the RRUFor details on how to add the OT terminals to the power cable, see pages 26 to 27 Adding OT Terminals to the Power Cable of the RRU.For details installing the Optical Module, see page 28 Installing the Optical Module.eClose the cover plate of the RRU cabling cavity1.4N•mzWhen wrapping the waterproofing tape, apply even force to extend the tape until the width of the tape is 1/2 of the original width. zWrap the joint spirally upward, downward, and then upward again. In other words, the joint is wrapped by three layers of the tape. Ensure that the upper layer of the tape covers about half of the lower layer when wrapping up the tape. zDo not remove the dustproof cap from the idle antenna port. Perform the waterproof, dustproof, and smokeprooftreatment if necessary. Use the waterproof tape to wrap the joints in outdoor applications.zUse the power cable clip to press the shielding layer tightly and ensure that the lower part of the shielding layer does not exceed the position shown in the preceding figure. zThe grounding resistance of the PGND cable should be less than 10 ohms. The PGND cable cannot be connected to the grounding terminal.zGround the shielding layer of the other end of the power cable.zAfter the cables are installed on the RRU, insert the waterproofing fillers into the idle cable holes.1.  The screw on the cover plate is tightened until the fastening torque is 1.4 N• m.2.  The screws on the cover plate are tightened in the order shown in the preceding figure.
20Installing the RRU CablesgRRU+APM30HRRU power cableCPRI optical cable1. The RRU power cable is connected to one group of the RRU0 to RRU5 terminals of the PDU.2. Strip the jacket off the RRU power cable for a small part, press the exposed shielding layer on the strap, and then connect the PGND cable on the strap to the nearest grounding bolt on the side in the APM30/APM30H, as shown in        ,        , and       .RRU power cableMetal shielding layer (25mm)PGND cableabcabc
21Installing the RRU CablesgRRU+BBU on the wallDCDU panel facing the side, and the BBU panel facing downward zThe RRU power cable is connected to LOAD0 to LOAD5 on the DCDU-03C. RRU power cableCPRI optical cableBBU power cable
22Installing the RRU CableshRRU+19-Inch cabinetLOAD0zAt the end of the RRU power cable connected to the DCDU-03C, you need to make the shielding layer of the power cable into an OT terminal, and then connect the OT terminal to the PGND terminal of the corresponding port on the DCDU-03C. For details about making an OT terminal, see pages 26 and 27. zThe RRU power cable is connected to LOAD0 to LOAD5 on the DCDU-03C. iRRU+TMC/TMC11HzAt the end of the RRU power cable connected to the DCDU-03C, you need to make the shielding layer of the power cable into an OT terminal, and then connect the OT terminal to the PGND terminal of the corresponding port on the DCDU-03C. For details about making an OT terminal, see pages 26 and 27. zThe RRU power cable is connected to LOAD0 to LOAD5 on the DCDU-03C. LOAD0RRU power cableCPRI optical cableRRU power cableCPRI optical cable
23RRU Hardware Installation ChecklistNo joint lies in the middle of the power cable or the PGND cable.5The connectors of signal cables are intact and securely linked.  And the signal cables are not damaged or broken.10All labels, tags, and nameplates are correct, legible, and complete. All the labels at both ends of the cables, jumpers and feeders should match.11The operating grounding and protection grounding of the base station and the lightning protection grounding of the building share one group of grounding conductors.9The power cable, PGND cable and other cables need to be bound separately.8The power cable and PGND cable are not short-circuited or reversely connected and are not damaged or broken.7The lugs at both ends of the power cable or the PGND cable are securely soldered or crimped.6Waterproof check: The empty cable troughs in the cabling cavity of the RRU are waterproofed. The cover plate is tightly buckled on the cabling cavity of the RRU. The RF ports that are not connected with RF cables are capped and waterproofed. The waterproof caps are fastened. 4The cover plate is fastened to the RRU cabling cavity.3The RRU is properly installed.2The position for each equipment conforms to the engineering design and meets the space requirement. Sufficient space is reserved for equipment maintenance.1ItemsNo.The RRU should be powered on in 24 hours after being unpacked. The power off duration of the RRU cannot exceed 24 hours during maintenance.Powering On the RRUCheck whether the input voltage of the RRU is normal?Power on the RRUStartEndaYesPower off the RRURectify the faultbCheck whether the status of the LEDs on the RRU is normal?NoYesNoRectify the faultaNormal input voltage of the RRU:If the BBU is supplied with -48 V DC power, the external input power voltage ranges from -57 V DC to -36 V DC.Normal status of the LEDs on the RRU:RUN LED: ON for 1s and OFF for 1sALM LED: OFFb
24ReferenceLift the RRU and installation components to the tower.a【Steering ropeLifting ropezWhen lifting the RRU to the tower, avoid collision of the RRU with the tower.zLift the RRU to the tower before it is installed on the metal pole, angle steel, or U-steel. Lower part of the adapting piece Do not fix only the handle of the RRU to the lifting rope. 1. Lead the lifting rope along the lower part of the adapting piece and then bind the RRU by using the lifting rope at the handle of the RRU. Bind the main fixture and auxiliary fixture by using the lifting rope. Bind the handle of the RRU by using the pulling rope. See the following figure.
25ReferenceLift the RRU and installation components to the tower.a2. Lift the RRU and installation components to the tower.zInstaller A climbs up to the tower, installs the fixed pulley on the support of the tower platform, and then leads the lifting rope through the fixed pulley. zInstaller C binds the RRU and installation parts using the lifting rope and fixes the handle of the RRU to the pulling rope. zInstaller B pulls the lifting rope downwards. At the same time, installer C pulls the steering rope outwards to avoid collision of the RRU with the installation parts or tower. zInstallers A catches the RRU and installation parts and then loosen the rope. zOn a tower, multiple RRUs cannot be installed in centralized mode. Fixed pulleySteering ropeLifting rope
26Reference1. OT terminals on the power cable:To assemble the OT terminals, perform the following steps:Adding OT Terminals to the Power Cable of the RRUbDetermine lengths of power cables for different operations according to the scales on the inner side of the cover plate of the cabling cavity.Based on the determined length, remove the jacket and shielding layer off the power cable.Remove the jacket of a specified length from each wire.Add an OT terminal to each wire.Remove about 15 mm jacket off the power cable to expose the shielding layer.-48 V DC power cableShieldinglayer GND wire-48 V power wireOT terminal15mm8mm14mm0 10203040
27ReferenceAdding OT Terminals to the Power Cable of the RRUb2.Assemble an OT terminal on the power cable at the end connecting to the power supply device.Stripped shielding layer in the heat-shrinkable tubePVC insulating tape OT terminal on the shielding layerDetermine the length on site. The recommended length is 150 mm.
281. The waterproof tape should be wrapped for an extra length of 20 mm away from the connectors at both ends. 2. The tapes are wrapped around the connector from the lower part to the upper part. When wrapped for another layer, the tapes may not be cut off.3. Apply average force to pull the tape until the width of the tape is 1/2 of the original width before wrapping up the waterproofing tape.4. Ensure that the upper layer of the tape covers over 50% of the lower layer when wrapping up the tape.5. The Insulation tape should be wrapped for an extra length of 20 mm away from the edge of the waterproof tape at both ends.6. Make sure that the last layer of the waterproof tape is wrapped from lower part to the upper part so that the rain flows along the wrapped waterproof tape.Waterproof tapeInsulation tape1. Wrap up the connectors with three layers of waterproofing tape2. Wrap up the connectors with three layers of Insulation tapeTightly pressed the tapeTightly pressed the tapeUse cable ties to fasten both ends of the tapes.Cable tieCable tieWaterproofing the outdoor cablescReferenceInstalling the optical Module d
29ReferencePin Assignment of the RRU AISG Extension cablefBrown+24VTwisted pairWhite/brownX2.6X1.6RS485 AGreenX2.5X1.5RS485 BTwisted pairWhite/greenX2.3X1.3OrangeDC Return ATwisted pairWhite/orangeX2.7X1.7Blue+12VTwisted pairWhite/blueX2.1X1.1InstructionWire TypeWire ColorPin of the AISG female connectorPin of the AISG male connectorPin Assignment for the Wires of the RRU Alarm CablegAPM TX+X9Twisted pairBrownRS485_RX+X1.3-X8X7X6X5X4X3X2Cord End Terminal---X1.shellAPM TX-ShieldWhite/brownRS485_RX-X1.5APM RX+GreenRS485_TX+X1.8APM RX-Twisted pairWhite/greenRS485_TX-X1.6GNDOrangeGNDX1.4SWITCH_INPUT1+Twisted pairWhite/orangeSWITCH_INPUT1+X1.7GNDBlueGNDX1.4SWITCH_INPUT0+Twisted pairWhite/blueSWITCH_INPUT0+X1.2LabelWire TypeWire ColorPin NameDB9 waterproof Connector
30Change History01 (2009-08-10)This is the draft release.This describes the changes in the RRU3201 V100R001C01 Installation Guide
HUAWEI TECHNOLOGIES CO., LTD.Huawei Industrial Base Bantian LonggangShenzhen 518129People’s Republic of Chinawww.huawei.com

Navigation menu