Firetide 5900-1 5900 Mesh Node User Manual Quick Installation Guide

Firetide Inc. 5900 Mesh Node Quick Installation Guide

Quick Installation Guide

 HotPort FT 5900 Mesh Node Quick Installation Guide  This quick installation guide describes how to install the HotPort node safely.  The HotPort is intended  to  be  installed  by  trained professionals.          Be  sure  to  read  and understand all installation Use an approved outdoor-rated antenna instead and safety instructions before proceeding with the installation. Model Use No. of Radios FT 5900, Worldwide, 2.4, 4.9, 5 GHz and 900MHz US only  The HotPort FT5900 contains two radios.  The number  of  radios  that  will  be  active  is determined by the license. Use of 802.11n MIMO is also enabled via license and other radio is dedicated 900MHz.     Package Contents The HotPort node package contains the items below  If you are missing any of these items, contact your Firetide. • HotPort FT5900 Mesh Node PCBA.  • HotPort FT5900 Quick Install Guide (this document). • Warranty and registration card. • Compact Disk (CD) with • HotView software. • HotView Pro User Guide. • HotPort FT5900 Hardware Installation Guide • Warranty/Registration Card. • EULA.
                   Front View of the FT5900 Board with 900MHz Radio Rear View of the FT5900 Board with Dual abgn Radio FT 5900 unit inside the chassis
   Planning Your Installation HotPort 5900 nodes are easy to install.  They are mechanically compatible with existing HotPort nodes.  HotPort 5900 nodes form their own mesh  Refer to the Hot View Pro Reference Guide for details Staging Considerations You  should  set  up  and  test  your  nodes  on  a  bench  or  table before installing them.  This will allow you to pre-configure the nodes so that they are all on the same RF channel, etc. 1. Set up your HotPort node in a lab with all other HotPort units using the right antennas,  2. Make the necessary connections and power the units. 3. Install the HotView Pro software on a workstation and connect the workstation to a HotPort node.  (See the HotView Pro Reference Guide for information about installing and using HotView)  You  will  use  HotView  Pro  to  configure  the  nodes  and  create a mesh network. Configure and test the settings you plan to use. 1.  Begin by checking to see that all nodes are visible in HotView.  If not, troubleshoot this problem according to the directions in the HotView Pro Reference Guide. 2.  Set the Country Code for your country of operation. 3.  Re-verify that all nodes are visible. 4.  Verify that dual-radio node and 900MHz Radio Node correctly are meshed.
   Installing the Node Node installation is straightforward. Insert the unit in the housing. Attach the antennas.  Apply  power.  The  power  LED  should illuminate  immediately;  after  about  60  to  90 seconds  the  status  LED  should  switch  to steady green     Antenna Orientation MIMO technology takes advantage of signal reflections to improve performance.  Antenna orientation affects this.  Firetide recommends that you begin deployment with the antennas   Depending on performance, you may wish to try other orientations. The antennas between the 900MHz node and the Dual radio node are sufficiently apart to avoid any interference -         FT 5900 Quick Install Guide Revision 1.01 2012-02-13 The contents of this Installation Guide are subject to change without notice. Please refer to the Firetide web site, www.firetide.com, for current versions

Navigation menu