Fiberstars WPC3 WIRELESS CONTROLLER FOR SWIMMING POOL PERIPHERALS User Manual WPC 1

Fiberstars, Inc. WIRELESS CONTROLLER FOR SWIMMING POOL PERIPHERALS WPC 1

USER MANUAL

  http://www.fiberstars.com 79-15097-00 REV B    Page 1 of 20 Installation Instructions: Read these instructions in their entirety before performing any installation work.Rated for use on 110/120VAC 60Hz and 220/240VAC 60Hz applications WPC-3 ETL LISTED Conforms to UL STD 508; Certified to CSA STD  C22.2 No. 14  FOR USE WITH POOL AND SPA PRODUCTS
                 2 1 3 4a, 4b 9 7 2114 6 8 1518 1910 1110 1213  1720 5 The WPC-3 single speed consists of the following parts:  Item  Qty.  Component part No.  Description 1 1  94-15106-00  WPC-3 Enclosure 2  1  94-15089-00  WPC-3 Enclosure Door 3 2  37-15000-00  Relay 4a  1  41-15004-12  12-Position Terminal Block 4b  1  41-15004-05  5-Position Terminal Block 5 1  42-15032-00  Timer 6  1  02-15269-00  Load Center Cover Plate 7 2  02-15267-00  WPC-2 Mounting Bracket 8 1  41-15003-00  Grounding Bar 9 2  94-15090-00  WPC Receiver 10  6  10-15086-04  Load Center Cover Plate, Switch Bracket, and Mounting Bracket Screws 11  5  10-15089-06  Terminal Block Mounting Screw 12 4  10-15060-01  Relay Mounting Screw 13 2  10-15089-03  Timer Mounting Screws 14  3  38-15012-00  3-Position Rocker Switch 15 1  94-15092-00  WPC Repeater 16 1  10-15089-02  Freeze Device Mounting Screw (Optional equipment) 17 1  20-15013-00  Strain Relief 18  1  02-15283-00  WPC-3 Timer and Switch Bracket 19 1  17-15005-00  Latch 20  2  10-15089-01  Latch Mounting Screws 21 1  43-15021-00  WPC-3 Antenna Splitter10 16  http://www.fiberstars.com 79-15097-00 REV B    Page 2 of 20
  http://www.fiberstars.com 79-15097-00 REV B    Page 3 of 20 2 1 3 9 18 14 6 4a, 4b 7 218 5  1922 1510 10 111213 1720 10 10 Accessory Items: FP 1/2  Temperature Freeze Device WE-65  65 ft Repeater Cord Extension Kit WPC-2/3 ST  GFCI Mounting Kit DL-HUB  Direct Light Hub Connection Kit TC-2  Additional Timeclock/Dust Cover WPC-TRANS  24V Transformer for Fiberstars Light Streams LED Products or JVA Control The WPC-3 dual speed consists of the following parts: Item  Qty.  Component part No.  Description 1 1  94-15106-00  WPC-3 Enclosure 2  1  94-15089-00  WPC-3 Enclosure Door 3 2  37-15000-00  Relay 4a  1  41-15004-12  12-Position Terminal Block 4b  1  41-15004-05  5-Position Terminal Block 5 2  42-15032-00  Timer 6  1  02-15269-00  Load Center Cover Plate 7 2  02-15267-00  WPC-2 Mounting Bracket 8 1  41-15003-00  Grounding Bar 9 2  94-15090-00  WPC Receiver 10  6  10-15086-04  Load Center Cover Plate, Switch Bracket, and Mounting Bracket Screws 11  5  10-15089-06  Terminal Block Mounting Screw 12 4  10-15060-01  Relay Mounting Screw 13 4  10-15089-03  Timer Mounting Screws 14  3  38-15012-00  3-Position Rocker Switch 15 1  94-15092-00  WPC Repeater 16 1  10-15089-02  Freeze Device Mounting Screw (Optional equipment) 17 1  20-15013-00  Strain Relief 18  1  02-15283-00  WPC-3 Timer and Switch Bracket 19 1  17-15005-00  Latch 20  2  10-15089-01  Latch Mounting Screws 21 1  43-15021-00  WPC-3 Antenna Splitter 22 1  37-15001-00  DPDT Relay16
  http://www.fiberstars.com 79-15097-00 REV B    Page 4 of 20 FCC WARNING  1. This device complies with Part 15 of the FCC Rules. Operation is subject to the following two conditions: (1) this device may not cause harmful interference, and (2) this device must accept any interference received, including interference that may cause undesired operation. 2. Changes or modifications not expressly approved by Fiberstars Inc. could void the user's authority to operate the equipment.SAVE THESE INSTRUCTIONS!  Basic safety precautions should be observed when operating the WPC-3 product and other associated equipment.  1. A qualified electrician must install the WPC-3 in accordance to the National and Local Electrical Codes. 2. The WPC-3 must not be less then 5 feet (3 meters in Canada) from inside edge of pool.  ONLY USE COPPER CONDUCTORS. 3. Do not exceed the maximum ratings of individual components, wiring devices, and current carrying capacity of conductors. 4. For the bonding, grounding, installing, and wiring of underwater lights to the WPC-3, refer to Article 680 of the National Electrical Code or Section 68 of the Canadian Electrical Code. 5. This device should never operate an equipment that could cause property damage, bodily injury, or death should it be activated unexpectedly. 6. Never allow children to operate the WPC-3 unsupervised. IMPORTANT SAFETY INFORMATION
    ELECTRICAL RATINGS Do not exceed the maximum electrical ratings of the WPC-3.  A circuit breaker rated at 20Amps at 120VAC must installed in the breaker panel to connect to the WPC-3 power input. Circuit 1 and Circuit 2 are each rated for use of up to 8Amps @ 120VAC.  The Pump Relay israted at a maximum of 3HP @ 240VAC.        SINGLE DOUBLE TWIN QUAD GFCBThomas & Betts TB TB TBBD TBBQ GFB FP-1C-TBCutler-Hammer BR BR BRD BRD GFCB BRFPSquare D HOM HOM HOM T HOM T HOM -GFI HOM FPMurray MP-T MP-T MH-T MH-T MP-GT LX100FPSiemens/ITE QPQPQTQTQPFQF-3Challenger C - A-CT - HAGF # FC-1CWestinghouse or Bryant BR - BQ - GFCB FP-1Crouse Hinds M P - TRIPLEX - M P-GF -GE Regular THOP - - - THOP-GF TQLFP-1SUITABLE LISTED B REAKERSCIRCUIT BREAKERMANUFACTURER FILLER PLATE           120V 240VAWG AMP LB-IN LB-IN HP HP AMP AMP14 15 3 5 2 0 1/ 2 1 15 1212 20 35 20 1 2 20 1610 30 35 20 1 1/2 3 30 248 504025 2 5 40326654535- -60444854535- - - -310050-----2100/12550-----General Purpose Branch Circuit Breaker RatingGeneral Purpose Branch Circuit Maximum Current CapacityWiring Inf ormation - Co pper Co nduct ors OnlyTerminal Torque*Wire Size 75°C min. InsulationSupply Circuit Breaker RatingLine and Neutral Main LugsNeutral and GroundMax Motor Load (Continuous Duty)                         http://www.fiberstars.com 79-15097-00 REV B    Page 5 of 20
  WARNING • TURN OFF INCOMING POWER BEFORE SERVICING EQUIPMENT.  • ALL INSTALLATION AND MAINTENANCE WORK MUST BE PERFORMED BY QUALIFIED ELECTRICAL PERSONELL ONLY. • VERIFY ALL ELECTRICAL RATINGS BEFORE INSTALLATION IS COMPLETE. LOCATION Install the WPC-3 enclosure using the mounting plates included with each enclosure.  The WPC-3 is housed in a Type 3R rainproof enclosure and can be mounted anywhere between the poolequipment and the breaker panel. NOTE: If a freeze protect device is required, please see Fiberstars part no. FP 1/2. WIRING INSTRUCTIONSFOLLOW PROPER WIRING PRACTICES IN ACCORDANCE WITH ALL LOCAL REGULATORY REQUIREMENTS. NEUTRAL  LINE - SECONDARY GROUNDLINE - PRIMARYPower Connections:  To wire the WPC-3 use insulatedCOPPER wire only, 12 gauge minimum.Run a ½” to ¾” conduit from the mainbreaker panel to the WPC-3.  Pullappropriate wires from the main breakerpanel to the WPC-3 unit.  To makepower connections remove 3/8 inches of insulation from wire ends.  Connect barewires to the Load Center as illustrated. Tighten terminal screws firmly (20 lb-inminimum).  Connect the common to theNeutral bar (tighten to 20 lb-in minimum).  http://www.fiberstars.com 79-15097-00 REV B    Page 6 of 20
  http://www.fiberstars.com 79-15097-00 REV B    Page 7 of 20 TO NEUTRAL BAR HOT LINE SIDE GROUND T/C NEUTRAL T/C POWER HOT LOAD SIDE  NEUTRAL LOAD SIDE GFCI 120VAC 20AMP CIRCUIT BREAKERNOTE:  DO NOT connect the T/C POWER and T/C NEUTRAL to the CI’s LOAD side. GFPower Connection with a GFCI To wire the WPC-3 with the use of aGFCI, punch out the GFCI knockouton the side of the WPC-3 enclosure.Install an outdoor rated GFCI.  UsingCOPPER wire only, 12 gaugeminimum, connect the GFCI from theLOAD side to the 120V LINEterminal.  Connect the NEUTRALfrom the LOAD side of the GFCI tothe NEUTRAL terminal.  Connect theGROUND of the GFCI to the EQUIP.GND. bar.  Wire the HOT from theGFCI’s LINE side to the 20 Amp circuit breaker.  Connect theNEUTRAL from the GFCI’s LINEside to the Neutral bar on the LoadCenter. Connect a wire from the 20Amp circuit breaker to the T/CPOWER as shown on the diagram.Connect a wire from the Neutral Barto the T/C NEUTRAL. Hooking up Lights to Circuit 2 and Circuit 3 To connect a lighting product to theCircuit 2 and Circuit 3 switch, pullwires from the products to the WPC-3 through conduits connected to thebottom of the WPC-3.  As illustrated,connect lights that will be operated bythe Circuit 2 Switch to the Circuit 2terminal.  Connect the Neutral to theTerminal Block marked Neutral.Connect the Ground to the Equip.GND. bar.  Repeat for Circuit 2.   NOTE: Do not exceed 8 Amps percircuit. NOTE: The WPC-3 is approved for use with the Intermatic Metallic Hub Kit(156PA14336A) and Fiberstars DL-HUB for direct connection of underwater lights.Refer to NFPA 70 Article 680 or C22.1 Section 68 for details.
  http://www.fiberstars.com 79-15097-00 REV B    Page 8 of 20 C/W CONTROL LIGHT CONTROL NEUTRAL Connecting Jazz, Jazz-Spa, System 6004, and System 6004-AS* For proper operation of these products both Circuit 2 and Circuit 3 must be wired so that thepower is controlled through Circuit 2 and the color wheels functions are controlled throughCircuit 3.  Follow each products installation manual for proper installation.  Run appropriatelyrated wires from the unit to the WPC-3 no less then 12 Gauge COPPER wires.  Connect the Power to the Circuit 2 terminal at one end and to the BLACK wire on the Fiberstars unit.Connect the neutral to the NEUTRAL terminal in the WPC-3 and to the WHITE wire on the Fiberstars unit.  Connect the grounding cable to the EQUIP. GND. and on the other end to the GREEN cable.  Finally, for synchronization operation, connect the C/W CONTROL cable tothe Circuit 3 terminal and on the other end to the RED wire on the Fiberstars unit.   NOTE: Do not exceed 8 Amps on Circuit 2. NOTE: The WPC-3 is approved for use with the IntermaticMetallic Hub Kit (156PA14336A) and Fiberstars DL-HUB for direct connection of underwater lights.  Refer to NFPA70 Article 680 or C22.1 Section 68 for details. * Or other two button Power/Color system, ie. Pentair, Supervision, Fiberworks…
  http://www.fiberstars.com 79-15097-00 REV B    Page 9 of 20 CONNECTING A 120VAC DEVICETO CIRCUIT 1 To wire a 120VAC device to the Relay,connect the LOAD wire from the device(as illustrated) to the Relay and a120VAC power from an appropriatelyrated circuit breaker using no less then a12 gauge COPPER wire.  Connect theNEUTRAL from the device directly tothe NEUTRAL bar at the breaker panel(as illustrated).  Alternately, you mayconnect the NEUTRAL from the deviceto the Relay and from the Relay to theNEUTRAL bar. NOTE:  The 120VAC device is not toexceed 15Amps nor 1.5HP. 120VAC Neutral at Subpanel Ground 120V Circuit Breaker CONNECTING A 240VAC PUMP  TO CIRCUIT 1 Connect the 240VAC pump to the relayas illustrated.  Connect a 240VAC CircuitBreaker to the Load Center.  Wire theRelay from the 240VAC Circuit Breakeras illustrated.  NOTE:  240V Pump not to exceed30amps nor 3HP. 240V Circuit Breaker  240VAC Pump
  http://www.fiberstars.com 79-15097-00 REV B    Page 10 of 20 HI SPEEDLO SPEED2 SPEED PUMP 240VAC CIRCUIT BREAKER POWER IN120V PRIMARY 120V SECONDARY CONNECTED TO 2 SPEED PUMP NOTE:  Pump Breaker MUST be turned OFF before servicing as 2nd leg of 240V circuit is HOT at all time! CONNECTING A 2-SPEED PUMP As illustrated, connect the Low Speedwire to the Low Speed Load terminal onthe terminal block.  Connect the HighSpeed wire to the High Speed Loadterminal on the terminal block.  Connectthe 120V Primary from the 240V CircuitBreaker to the 120V PRI INPUTterminal.  Directly connect the 120VSecondary from the Circuit Breaker tothe 2 Speed Pump.  NOTE:  The Secondary 120V must bedirectly connected to thepump for 240V operation. 240V Circuit Breaker 240VAC PumpCONNECTING A 240VAC PUMP Connect the 240VAC pump to the relayas illustrated.  Connect a 240VACCircuit Breaker to the Load Center.Wire the Relay from the 240VACCircuit Breaker as illustrated. NOTE:  240V Pump not to exceed30amps nor 3HP. PUMP CONNECTIONS  NOTE:  Some models are ONLY equipped with Single Speed OR Dual Speed pump  connections.
  http://www.fiberstars.com 79-15097-00 REV B    Page 11 of 20 TO HEATER TO HEATER Heater Connection (Optional Equipment). To connect a heater, run the pilot wires from the heater to the WPC unit.  Connect the wires to the terminal block labeled Heater.  NOTE: The Heater circuit only completes the circuit of the Heater terminals when the 24V Valve control is energized to the NO Load circuit. 24V Valve Wiring (Optional Equipment). To connect a 24V Valve, follow diagram asshown.  Connect one leg of the 24V commonto the 24V TO VALVE terminal.  Connectthe Close wire to the NC LOAD terminal andthe Open wire to the NO LOAD terminal.  NOTE:  In the Pool/Spa Combo units(WPC3-??4?-?, where ? = any number),there maybe two (2) JVA connections.  SeeJVA Installation and Operational manualfor JVA synchronization methods. COMMON TO VALVEOPEN WIRE FROM VALVE CLOSE WIRE FROM VALVE
  http://www.fiberstars.com 79-15097-00 REV B    Page 12 of 20 FOR USE WITH TC-2 OPTION FOR USE WITH TC-2 OPTION FOR TEMPERATURE FREEZE PROTECT SWITCH OPTION FOR TEMPERATURE FREEZE PROTECT SWITCH OPTION SINGLE SPEED INTERNAL WIRING SCHEMATIC
  http://www.fiberstars.com 79-15097-00 REV B    Page 13 of 20 FOR USE WITH TC-2 OPTION FOR TEMPERATURE FREEZE PROTECT SWITCH OPTION FOR USE WITH TC-2 OPTION FOR TEMPERATURE FREEZE PROTECT SWITCH OPTION DUAL SPEED INTERNAL WIRING SCHEMATIC
  http://www.fiberstars.com 79-15097-00 REV B    Page 14 of 20 10 feet Repeater Orientation Marker Mounting Holes Base Slit for Repeater Wire Repeater Dome  Repeater Base Mounting Screws Locking Dimple Dome/Base groove Flathead Screwdriver Repeater Mounting The WPC-3 is equipped with a signal repeater that can be mounted up to 10 feet from the WPC-3 unit.  This repeater receives signals from the wireless remote and sends that signal to the WPC-3 via the 10 foot cable.  Establish a location for the Repeater that is in line of sight from where thewireless remote will be used most frequently and that is no more then 75 feet from furthest wherethe remote will be used.  NOTE:  If extension is needed, use Fiberstars part number WE-65and follow installation instructions supplied with the Repeater Extension.  To mount the Repeater, carefully insert a small flathead screwdriver into groove between theDome and Base approximately where the locking dimples are located.  Pry the Dome out of the locking dimples.  Then carefully insert the small flathead screwdriver into the groove between theDome and the Base in an adjacent locking dimple and pry the Dome out.  Then separate the Domefrom the Base by hand.  Using the supplied self-drilling screws, locate a suitable mounting surface and screw the base to this surface.  Note that the marking “TOP” must be in the 12o’clock position and the wire slit must be in the 6 o’clock position.  Do not over tighten thescrews as it may damage the Repeater base.  Realign the Repeater Dome to the Base and ensurethat the wire is exiting the base through the slit and the Locking Dimples are aligned with thelocking holes.  Apply enough pressure so that the Dome “snaps” into the base. NOTE: Do not stuff the remainder of the Repeater wire into the WPC unit.
  http://www.fiberstars.com 79-15097-00 REV B    Page 15 of 20 NOTE:  Switch is shown in the ON position.WPC-3 ROCKER SWITCH OPERATION The WPC-3 receiver box houses three rocker switches. For operation with the wireless transmitter, the switchesneed to be in the DOWN or REMOTE position.  Tomanually turn ON the devices connected to Circuit 1,Circuit 2, or Circuit 3, flip the rocker switches UP or to the ON position.  When a circuit is in the ON position,the Wireless Remote will not be able to turn OFF the respective circuit.  To turn OFF the devices manually,flip the respective toggle switch to the MIDDLE or OFFposition. NOTE: In the OFF position, the wireless remoteoperation will be bypassed.  To re-enable the wireless remote operation, flip the toggle switch back to the BOTTOM or REMOTE position.  NOTE:  If the units turn ON when the switch is returnedto the REMOTE position, simply use the wirelessremote to turn OFF the units if desired. Circuit 3 control For Synchronization of Circuit 2 and Circuit 3 Circuit 1 control Circuit 2 control WIRELESS REMOTE OPERATION NOTE:  The rocker switches on the WPC-3 must be set to REMOTE for wireless operation.  The POWERON/OFF buttons control the individual circuitsindependently.  With each push of the button, theWPC-3 toggles the individual circuits from ON to OFFand vice versa.  For Synchronization operation, simplypush the SYNC ON/OFF button. NOTE:  If all circuits are off when the SYNC ON/OFFbutton is pressed, all circuits will be turned toON.  If any one of the circuits are in the ONstate by the wireless remote, then when theSYNC ON/OFF button is pressed all circuits will be turned OFF and the SYNC ON/OFF must bepressed to turn all circuits on simultaneously.  NOTE:  Synchronization is for Circuits 2 and 3 only.  NOTE:  For Dual Speed models, Pump switch operatesHi Speed only.OPERATING INSTRUCTIONS
  http://www.fiberstars.com 79-15097-00 REV B    Page 16 of 20 OPERATION INSTRUCTIONS FOR POOL/SPA COMBO OPTION WIRELESS REMOTE OPERATION NOTE:  The rocker switches on the WPC-3 must be set to REMOTE for wireless operation.  The SPA ON/OFF button actuates the JVA valves and the Filter pump aswell as turn on the Heater.  If the Filter pump is alreadyin the ON position by the time clock, then just the JVAvalves will be actuated to the SPA position and the Heater will be turned ON.  The Pool Light button turns ON and OFF the PoolLight with each push of the button.  The SPA Light button turns ON and OFF the SPALight with each push of the button.  For Synchronization operation, simply push the SYNCON/OFF button to turn ON and OFF the SPA Light andthe Pool Light simultaneously.  If one of the lights is onwhen the SYNC button is pressed, that light will turnOFF and the SYNC button will have to be pressed onceagain to turn both SPA and Pool Lights ON.  NOTE:  If all circuits are off when the SYNC ON/OFFbutton is pressed, all circuits will be turned toON.  If any one of the circuits are in the ONstate by the wireless remote, then when theSYNC ON/OFF button is pressed all circuits willbe turned OFF and the SYNC ON/OFF must bepressed to turn all circuits on simultaneously.  NOTE:  Synchronization is for Pool Light and Spa Lightonly.  NOTE:  For Dual Speed models, the SPA ON/OFF button actuates the Hi Speed pump whileactuating the JVA valves.
  http://www.fiberstars.com 79-15097-00 REV B    Page 17 of 20 Single Speed Shown  PM hoursTimer dialTIMER OPERATION Set time to current time.  Open timer cover by lifting from the bottom towards you.  In theexample below, the current time is set for 9:00 pm.  NOTE:  Only turn the Timer dial clockwise or the timer will be damaged.  Once the time has been set to the current time, setthe hours of the Pump operation by “snapping” the timer tabs inwards towards the center.NOTE:  Each tab represents 15 minutes of operation and tabs set inwards towards thecenter is for OFF operations and ON when the tabs are set outwards as illustrated. In the example below, the Pump will be off from 12:00 pm to 11:45 pm.  Once the time and time of operation has been set, ensure that the Timer function switch is set toAuto for timer control of the Pump as illustrated below.  To turn off timers automatic functions,set the Timer function switch to OFF.  To manually turn on the Pump, set the Timer functionswitch to the ON position.  NOTE:  When in the ON position, the Pump will continue to rununtil the Timer function switch is set to Auto where the tabs at the Set Point is in the OFF position or if the Timer function switch is rotated to the OFF position.  Apply the timer label to the timer cover plate.  Close the timer cover firmly after timer is set. Timer tabs set to OFF position Timer dial rotation direction indicator Timer Plate Timer Cover Timer tabs set to ON position Current time and Timer function switch set point AM hours Timer function switch
  http://www.fiberstars.com 79-15097-00 REV B    Page 18 of 20 Spacers Receiver screws Load Center Cover Plate Molex Connector Switch Bracket Mounting Screws Receiver Mounting Screws  Bracket Spacer Terminal BlockTwo ReceiversBracket Spacer CODE ADJUSTMENTS If it is necessary to change the transmission code on the WPC-3 an adjustment to the two receivers AND the transmitter DIP switches must be performed.  RECEIVER DIP SWITCHES – Turn OFF power to the WPC-3 from the circuit breaker on the Load Center or from Main Power.  Open the enclosure door.  Unscrew and remove the Load Center Cover Plate.  Place the CoverBracket in a safe location.  Unscrew and remover the Switch Bracket.  Disconnect the Molex connector that connectsthe Switch Bracket controls to the receiver unit and set the Switch Bracket in a safe location where it will not be bent, scratched, or impact forces applied to the components or the face plate itself [Notes: There maybe more then one Molex connector that must be disconnected].  Unscrew the four (4) screws holding the two Receivers to the base of the WPC-3 enclosure [NOTE: Do not lose the spacers].  Unscrew the four (4) screws located on the back of each receiver to release the cover.  NOTE:  Take notice of how the wires enter and exit the receiver and which receiveris connected to the Circuit 2 and Circuit 3 terminals on the terminal block.  Remove the cover and look on thePCB to locate the DIP switch as illustrated.  TRANSMITTER DIP SWITCHES – Remove all screws from rear of remote.  Separate the bottom cover from thetop cover.  DIP SWITCH ADJUSTMENT – On each Receiver, there is a four (4) position DIP switch and on the Transmitterthere is a three (3) position DIP switch.  On the receivers, the DIP switches 1 through 3 must be set identically to eachother and the Transmitter.  Changing just one DIP switch will change the code.  The fourth (4th) DIP switch on the receivers determine the Primary and Secondary roles of the PCB’s.  The two receivers MUST have the fourth (4th) DIP switch set differently from one another.  When the fourth (4th) DIP switch is in the ON position, then it will receive the Pump and Circuit 1 signal and when in the OFF position, it will receive the Circuit 2, Circuit 3, andSynchronization signals from the remote.  Ensure that the Receiver with the fourth (4th) DIP switch ON is connected to the Pump and Circuit 1 Relays and that the Receiver with the fourth (4th) DIP switch OFF is connected to the Circuit 2 and Circuit 3 terminals on the Terminal Block.
  http://www.fiberstars.com 79-15097-00 REV B    Page 19 of 20  DIP switch DIP Switch Rear screwsCHANNEL Fourth (4th) DIP switch 159132 6 10 143 7 11 154 8 12 16NOTE:  ONLY CHANNELS 1 THROUGH 8 ARE AVAILABLE FOR THE WPC-3. DIP SWITCH Note:  Sample shown is of Channel 8. DIP SWITCH123Channel 1 OFF OFF OFFChannel 2 ON OFF OFFChannel 3 OFF ON OFFChannel 4 ON ON OFFChannel 5 OFF OFF ONChannel 6 ON OFF ONChannel 7 OFF ON ONChannel 8ONONONDIP SWITCH SETTINGS Optional Equipped Units WPC3-XXXX-1 : Single Speed with Freeze Protect.  No additional wiring required. WPC3-2XXX-1  : Dual Speed with Freeze Protect.  No additional wiring required.
 WPC FUNCTION CHART  Below is a chart of the WPC functionality based on the model number.   Other Options Accessories http://www.fiberstars.com  WPC3    -                                                -        Pump Features  Button 2 Features  Pump Button Features X – Standard 1 – Load Center       Removed X – Standard 2 – One JVA Valve Switching 4 – Two JVA Valve Switching for       Pool/Spa combo w/HTR controlX – Standard 3 – WFPR added for Booster       Pump X –1 Speed Pump – Standard 3 – 2 Speed Pump w/T.C. for Lo Speed &      T.C. for Hi Speed X – Standard 1 – Freeze Protect 2 – T/C w/Relay for Pool       Cleaner Booster Pump5 – FP & T/C w/Relay       for Pool Cleaner       Pump                          EXAMPLE:  WPC3-3X2X-1 is a 2 speed pump model with two time clocks (one to control High Speed and one to control Low Speed).  Pump Button turns ON High Speed pump regardless of timer position and activates the JVA valve.  This unit is also equipped with a Freeze Protection device that will activate High Speed pump operation at 34°F and resume normal operation at 39°F. 79-15097-00 REV B    Page 20 of 20

Navigation menu