Comba Telecom RX-7W22 700/800MHz Public Safety Bi-directional Amplifier User Manual RX7W22 Manual V1

Comba Telecom Ltd. 700/800MHz Public Safety Bi-directional Amplifier RX7W22 Manual V1

RX7W22 Manual V1

         DDIIGGIITTAALL  BBAANNDD    SSEELLEECCTTIIVVEE  RREEPPEEAATTEERR  USER MANUAL Public Safety BDA SERIES QE: 1-0-0            Comba Telecom Ltd. Public Safety BDA
_____________________________________________________________________________________________        The information contained herein is the responsibility of and is approved by the following, to whom all enquiries should be directed in the first instance:  This is an unpublished work the copyright in which vests in Comba International ("Comba"). All rights reserved.  The information contained herein is confidential and the property of Comba and is supplied  without  liability  for  errors  or  omissions.  No  part  may  be  reproduced, disclosed or used except as authorised by contract or other written permission. The copyright and the foregoing restriction on reproduction and use extend to all media in which the information may be embodied.
INSTALLATION GUIDE FOR RX7W22  ENU STATUS : 1-0-0 Copyright - refer to title page Page 3     0.1  CONTENTS Section Page  0.1 CONTENTS ....................................................................................................................................... 3 0.2 INDEX TO FIGURES AND TABLES ............................................................................................. 4 0.3 HISTORY ........................................................................................................................................... 5 0.4 GLOSSARY OF TERMS ................................................................................................................. 6 0.5 SAFETY NOTICES AND ADMONISHMENTS ............................................................................ 7 1 GENERAL INFORMATION ............................................................................................................. 8 2 EQUIPMENT DESCRIPTION ......................................................................................................... 9 2.1 FUNCTIONAL BLOCK DIAGRAM ................................................................................................. 9 2.2 EQUIPMENT LAYOUT .................................................................................................................. 10 2.3 EQUIPMENT CONSTITUTION .................................................................................................... 11 3 INSTALLATION .............................................................................................................................. 12 3.1 WARNINGS AND ALERTS ........................................................................................................... 12 3.2 SITE PLANNING CONSIDERATIONS ....................................................................................... 13 3.2.1 SITE PLANNING ............................................................................................................................ 13 3.2.2 INSTALLATION CHECKLIST ....................................................................................................... 14 3.3 INSTALLATION PROCEDURES ................................................................................................. 15 3.3.1 GOODS INWARDS INSPECTION............................................................................................... 15 3.3.2 TOOLS ............................................................................................................................................. 15 3.3.3 PREPARATION .............................................................................................................................. 15 3.3.4 WALL MOUNTING ......................................................................................................................... 16 3.3.5 DRIP-LOOP ..................................................................................................................................... 16 3.4 EQUIPMENT CONNECTORS ...................................................................................................... 17 3.4.1 PS BDA CONNECTORS ............................................................................................................... 17 3.4.2 PS BDA LED INDICATORS.......................................................................................................... 18 3.4.3 GROUNDING CONNECTION ...................................................................................................... 18 3.4.4 RF CABLE CONNECTION ........................................................................................................... 18 3.4.5 ETHERNET CONNECTION ......................................................................................................... 18 3.4.6 PHYSICAL CONNECTION TO OMT PC .................................................................................... 19 4 COMMISSIONING ......................................................................................................................... 19 4.1 PRE-COMMISSIONING TASKS .................................................................................................. 19 4.2 COMMISSIONING PROCEDURE ............................................................................................... 20 5 WEB GUI ......................................................................................................................................... 22 5.1 WEB GUI CONNECTION ............................................................................................................. 22 5.2 WEB GUI INTRODUCTION .......................................................................................................... 23 5.2.1 [DEVICES] ....................................................................................................................................... 23 5.2.2 [COMMISSIONING] ....................................................................................................................... 25 5.2.3 [FIRMWARE] ................................................................................................................................... 25 5.2.4 [MANAGEMENT] ............................................................................................................................ 26 5.3 COMMISSIONING PROCEDURE ............................................................................................... 32 6 MAINTENANCE .............................................................................................................................. 37 7 APPENDICES ................................................................................................................................. 38 7.1 APPENDIX A: TOOLS ................................................................................................................... 38 7.2 APPENDIX B: RMA (RETURN MATERIAL AUTHORIZATION) FORM ................................ 39
INSTALLATION GUIDE FOR RX7W22  ENU STATUS : 1-0-0 Copyright - refer to title page Page 4     0.2  INDEX TO FIGURES AND TABLES  Figure 1:  Front, Side and Bottom Views of the PS BDA Enclosure ............................................................ 8 Figure 2: PS BDA Functional Block Diagram............................................................................................... 9 Figure 3: Layout of the PS BDA ................................................................................................................. 10 Figure 4: Mounting Rack Overview ............................................................................................................ 15 Figure 5: PS BDA Wall Mounting ............................................................................................................... 16 Figure 6: Equipment Connectors ............................................................................................................... 17 Figure 7: OMT Connection without Opening Chassis ................................................................................ 19 Figure 8: Input IP Address ......................................................................................................................... 22 Figure 9: Input Domain Name .................................................................................................................... 22 Figure 10: Input User Name and Password ............................................................................................... 22 Figure 11: Web GUI Main Screen .............................................................................................................. 23 Figure 12: Overview Screen....................................................................................................................... 23 Figure 13: 800 Screen ................................................................................................................................ 24 Figure 14: 700 Screen ................................................................................................................................ 24 Figure 15: [Commissioning] Screen ........................................................................................................... 25 Figure 16: [Firmware] Screen – MCU Firmware Upgrade ......................................................................... 25 Figure 17: [Management] Screen .............................................................................................................. 26 Figure 18: Management – Import & Export ................................................................................................ 26 Figure 19: Management – IP Setting ......................................................................................................... 27 Figure 20: Management – Comm. Setting ................................................................................................. 27 Figure 21: New Site Report is for easy monitoring set up ......................................................................... 28 Figure 22: Management – Security ............................................................................................................ 28 Figure 23: Modify Password....................................................................................................................... 29 Figure 24: Management – Device Reset ................................................................................................... 29 Figure 25: Management – Device Info ....................................................................................................... 30 Figure 26: Management – Isolation ........................................................................................................... 30 Figure 27: Management-Dry Contact ......................................................................................................... 31 Figure 28: Management-Test ..................................................................................................................... 31 Figure 29: Management – Report .............................................................................................................. 32 Figure 30: Commissioning Procedure - Start ............................................................................................. 32 Figure 31: Commissioning Procedure – Site Info. Setting ......................................................................... 33 Figure 32: Dev Info & Date/Time ............................................................................................................... 33 Figure 33: Commissioning Procedure – Isolation Detective ...................................................................... 34 Figure 34: Commissioning Procedure – Isolation Detective Confirm ........................................................ 34 Figure 35: Commissioning Procedure –Isolation Detection Failed ............................................................ 34 Figure 36: Commissioning Procedure –Isolation Detection Finish ............................................................ 35 Figure 37: Commissioning Procedure – Center Frequency Setting .......................................................... 35 Figure 38: Commissioning Procedure – Finish .......................................................................................... 36  Table 1: Equipment Connectors ................................................................................................................ 17 Table 2: LED Indicators .............................................................................................................................. 18 Table 3: Commissioning Task Explanation ................................................................................................ 21
INSTALLATION GUIDE FOR RX7W22  ENU STATUS : 1-0-0 Copyright - refer to title page Page 5     0.3  HISTORY Change No. ENU Details Of Change  1 1-0-0 This manual first created and issued in Apr. 2016.   .
INSTALLATION GUIDE FOR RX7W22  ENU STATUS : 1-0-0 Copyright - refer to title page Page 6     0.4  GLOSSARY OF TERMS Abbreviation  Definition  ALC  Automatic Level Control  ATT  Attenuator BTS Base Transceiver Station CH Channel  CSA Cross Sectional Area dB  Decibel  dBm  Decibels relative to 1 milliwatt DL  Downlink DT  Donor Terminal  DPX Duplexer FS Frequency Selection GSM  Global Standard for Mobile Communication Hz  Hertz  ID Identification  IF Intermediate Frequency LNA  Low Noise Amplifier LOS Line-of-Sight MCU  Main Control Unit  MHz  Megahertz  MT  Mobile Terminal  MTBF  Mean Time Between Failures  NF  Noise Figure  OMC  Operation & Maintenance Center  OMT  Operation & Maintenance Terminal PA Power Amplifier PLL  Phase Locked Loop  PSU  Power Supply Unit  RF  Radio Frequency  SIM Subscriber Identification Module SMA  Sub-Miniature A Connector  SMS Short Message Service UL  Uplink  VAC Volts Alternating Current VDC Volts Direct Current VSWR  Voltage Standing Wave Ratio
INSTALLATION GUIDE FOR RX7W22  ENU STATUS : 1-0-0 Copyright - refer to title page Page 7     0.5  SAFETY NOTICES AND ADMONISHMENTS This document contains safety notices in accordance with appropriate standards. In the interests of conformity with the territory standards for the country concerned, the equivalent territorial admonishments are also shown.  Any installation, adjustment, maintenance and repair of the equipment must only be carried out by trained, authorized personnel. At all times, personnel must comply with any safety notices and instructions.  Specific hazards are indicated by symbol labels on or near the affected parts of the equipment. The labels conform to international standards, are triangular in shape, and are colored black on a yellow background. An informative text label may accompany the symbol label.  Hazard labeling is supplemented by safety notices in the appropriate equipment manual. These notices contain additional information on the nature of the hazard and may also specify precautions.   Note: The grantee is not responsible for any changes or modifications not expressly approved by the party responsible for compliance. Such modifications could void the user’s authority to operate the equipment.   For compliance with the general population RF exposure limits, each individual antenna used for this transmitter must be installed to provide a separation distance greater than 67.2cm or more from all persons during normal operation and must not be co-located with any other antenna for meeting RF exposure requirements.   Warning Notices:  These draw the attention of personnel to hazards that may cause death or injury to the operator or others. Examples of use are cases of high voltage, laser emission, toxic substances, point of high temperature, etc.   Alert:  These draw the attention of personnel to hazards that may cause damage to the equipment. An example of use is the case of static electricity hazard.   Caution notices may also be used in the handbook to draw attention to matters that do not constitute a risk of causing damage to the equipment but where there is a possibility of seriously impairing its performance, e.g. by mishandling or gross maladjustment. Warnings and Cautions within the main text do not incorporate labels and may be in shortened form.   Disconnection of the 2 RF connectors may cause damage to the equipment when power is on.  The application antenna and RF cable are not provided. The antenna gain should not exceed 10 dBi.       End of Section
INSTALLATION GUIDE FOR RX7W22  ENU STATUS : 1-0-0 Copyright - refer to title page Page 8     1  GENERAL INFORMATION The RX-7W22 is a new digital dual band public safety repeater (hereafter referred to as PS BDA) designed to protect the lives of first responders and building occupants. Through the use of digital filtering technology (DSP), the RX-7W22 helps eliminate adjacent channel interference to allow band selectivity and support 700MHz and 800MHz rebanding. Up to two non-contiguous frequency bands can be simultaneously supported in each of the 700MHz and 800MHz Public Safety frequencies via web-based GUI, which provides versatility and total control to the user.  Main Features   PS 700 and 800MHz  Class A BDA, 32 channel per band  Channel selective, software programmable  Auto diagnostic  Uplink squelch, per channel and per time slot  User adjustable gain control, UL and DL independent per channel  US and Canada 700MHz and 800MHz band compatible, software adjustable  Easy commission and setup via Web-based GUI  Weatherproof enclosure, IP65/NEMA4X  Fully compliant with the 2010 NFPA 72 Code  Competitive size and weight  Alarming output to supervised circuits for: antenna failure, amplifier failure.   The following figure shows the enclosure of the PS BDA.    Figure 1:  Front, Side and Bottom Views of the PS BDA Enclosure     DT MTAC 100V-240V  50Hz/60HzAUXPWRALMRUNALM1MT_TESTDT_TESTLANOMTALM2
INSTALLATION GUIDE FOR RX7W22  ENU STATUS : 1-0-0 Copyright - refer to title page Page 9     2  EQUIPMENT DESCRIPTION 2.1  FUNCTIONAL BLOCK DIAGRAM   Figure 2: PS BDA Functional Block Diagram  In the downlink, the BTS signals are received by donor antenna of the repeater. After the duplexer, the signals are sent to the LNA module for pre-amplification and digital RF integrated module for digital filtering and frequency conversion. Then the DL signals will be sent to downlink PA to amplify power and filter via duplexer. After amplification, the signals are transmitted at the MT port to the service antenna.    In the uplink, the mobile signals are received by the service antenna. After the MT port integrated duplexer, the signals are sent to the LNA, integrated module for digital filtering, then to PA for power amplification and to duplexer. After that, the uplink signals are sent to the donor antenna for transmission back to the BTS.                 RXDL PAMT Port DuplexerUL`TX MTPLL2RXTXDT Port DuplexerDTPLL1800MHz Integrated Digital Module           DL PATXPLL1TX700MHz Integrated Digital ModuleDLUL PA
INSTALLATION GUIDE FOR RX7W22  ENU STATUS : 1-0-0 Copyright - refer to title page Page 10     2.2  EQUIPMENT LAYOUT Shown below is the internal layout of the PS BDA.   Figure 3: Layout of the PS BDA     MCUDuplexerPower SupplyModuleIntegratedModuleChasis IntegratedModule
INSTALLATION GUIDE FOR RX7W22  ENU STATUS : 1-0-0 Copyright - refer to title page Page 11     2.3  EQUIPMENT CONSTITUTION The typical PS BDA unit consists of the following components:   Power Amplifier (PA): It fulfils power amplification in both UL and DL branches.   Main Control Unit (MCU): The MCU is used to monitor and control the operation of the repeater. It also provides the communication interface for remote control and indication. LED indicators provide the operation status of the MCU.  Duplexer: The DPX is located towards the MT terminals and permits the uplink and downlink signals to share a common antenna.  Digital Integrated Module and Power Amplifier: Consists of Power Conversion module, RF module, digital process module and monitoring module. Power Conversion module converts +28V DC voltage in to +9VJK and +9VRF. +9VJK, +9VRF are supplied to monitoring unit and RF unit in integrated module separately. RF module amplifies and converts the RF signal to IF signal. Digital process module converts the IF signal into baseband signal via AD conversion and extraction, filtering. After that, IF signal will be amplified and converted to RF signal by RF module for RF filtering and amplification. Monitoring module monitors and controls the system parameters and is the interface of both remote monitoring and local commissioning.  Power Supply Unit (PSU): The PSU converts the input voltage into a stable DC to provide power for the internal functional modules.
INSTALLATION GUIDE FOR RX7W22  ENU STATUS : 1-0-0 Copyright - refer to title page Page 12     3  INSTALLATION 3.1  WARNINGS AND ALERTS Radio Frequency Energies  There may be situations, particularly for workplace environments near high-powered RF sources, where recommended limits for safe exposure of human beings to RF energy could be exceeded. In such cases, restrictive measures or actions may be necessary to ensure the safe use of RF energy.   High Voltage  The equipment has been designed and constructed to prevent, as far as reasonably, practicable danger. Any work activity on or near equipment involving installation, operation or maintenance must be, as far as reasonably, free from danger.   Where there is a risk of damage to electrical systems involving adverse weather, extreme temperatures, wet, corrosive or dirty conditions, flammable or explosive atmospheres, the system must be suitably installed to prevent danger.   Protective Earthing  Equipment provided for the purpose of protecting individuals from electrical risk must be suitable for the purpose and properly maintained and used.    Handling Precautions  This covers a range of activities including lifting, lowering, pushing, pulling, carrying, moving, holding or restraining an object, animal or person from the equipment. It also covers activities that require the use of force or effort, such as pulling a lever, or operating power tools.   Where some of the abovementioned activities are required, the equipment must be handled with care to avoid being damaged.   Electrostatic Discharge (ESD)  Observe standard precautions for handling ESD-sensitive devices. Assume that all solid-state electronic devices are ESD-sensitive. Ensure the use of a grounded wrist strap or equivalent while working with ESD-sensitive devices. Transport, store, and handle ESD-sensitive devices in static-safe environments.
INSTALLATION GUIDE FOR RX7W22  ENU STATUS : 1-0-0 Copyright - refer to title page Page 13     3.2  SITE PLANNING CONSIDERATIONS 3.2.1  SITE PLANNING Site Considerations  Outdoor equipment are designed to be waterproof, rainproof, and with snow protection. Temporary protection should be taken when the equipment enclosure is opened for installation or maintenance in an outdoor environment. The equipment must not be opened for installation or maintenance in bad weather (e.g. gale, storm rainfall, extreme temperatures and high humidity)   Installation Location  Mounting surface shall be capable of supporting the weight of the equipment.  In order to avoid electromagnetic interference, a proper mounting location must be selected to minimize interference from electromagnetic sources such as large electrical equipment.   Environmental  Humidity has an adverse effect on the reliability of the equipment. It is recommended to install the equipment in locations having stable temperature and unrestricted air-flow.   The installation location for the product should be well ventilated. The equipment has been designed to operate at the temperature range and humidity level as stated in the product specifications in the datasheet.  Direct sun light exposure to the equipment should be avoided. Provide additional shelter if necessary.   Power Supply  The power supply unit (PSU) provides power to all modules within the equipment. Depending on the product variant, it is recommended that the PSU operates on a dedicated circuit breaker or fused circuit.   Grounding Requirement  Verify that the equipment has been well grounded. This includes antennas and all cables connected to the system. Ensure lightning protection for the antennas is properly grounded.    Cable Routing  Depending on equipment configuration, a variety of types of cables are required. Where applicable, ensure cables are properly routed and secured so that they are not damaged.   Manual Handling  During transportation and installation, take necessary handling precautions to avoid potential physical injury to the installation personnel and the equipment.
INSTALLATION GUIDE FOR RX7W22  ENU STATUS : 1-0-0 Copyright - refer to title page Page 14     3.2.2  INSTALLATION CHECKLIST   Working space available for installation and maintenance for each mounting arrangement. Ensure unrestricted airflow.    Ensure earthing point is within reach of the ground wire.    Ensure a power source is within reach of the power cord and the power source has sufficient capacity.     Where appropriate, ensure unused RF connectors are terminated.    Do not locate the equipment near large transformers or motors that may cause electromagnetic interference.    Reduce signal loss in feeder cable by minimizing the length and number of RF connections.    Ensure VSWR of antennas system < 1.5:1.    Ensure equipment will be operated within the stated environment (see datasheet)    Observe handling of all cables to prevent damage.    Donor antenna should have a narrow beamwidth and positioned in line-of-sight (LOS) to donor BTS site so that the donor signal level is maximized. This allows the use of minimum gain to achieve the maximum DL output power. The UL gain is typically set lower than or equal to the DL gain to minimize noise interference to the donor BTS    Service antenna should be selected based on the type of service area, e.g., indoor antenna for indoor application, and panel antenna for outdoor application.
INSTALLATION GUIDE FOR RX7W22  ENU STATUS : 1-0-0 Copyright - refer to title page Page 15     3.3  INSTALLATION PROCEDURES 3.3.1  GOODS INWARDS INSPECTION  Verify the number of packages received against the packing list.   Check all packages for external damage; report any external damage to the shipping courier. If there is damage, a shipping agent should be present before unpacking and inspecting the contents because damage during transit is the responsibility of the agent.   Open and check each package against the packing list. If any items are missing, contact Comba.   Do not remove items from anti-static packing until ready for installation. If damage is discovered at the time of installation, contact the shipping agent.   3.3.2  TOOLS See Appendix A for a full list of the recommended tools required for installation and routine maintenance.   3.3.3  PREPARATION   Wall mounting with the masonry bolts supplied, which make use of the outer holes.     Figure 4: Mounting Rack Overview
INSTALLATION GUIDE FOR RX7W22  ENU STATUS : 1-0-0 Copyright - refer to title page Page 16     3.3.4  WALL MOUNTING    Drill four holes on the wall using the position of four holes on the mounting rack as a guide. Fix the mounting rack to the wall using four masonry bolts (M10x110mm).   Install the Mounting Rack2 on the both side of the enclosure.    Hang up the equipment and secure the enclosure to the mounting rack.     Figure 5: PS BDA Wall Mounting    3.3.5  DRIP-LOOP Comba recommends that every horizontal cable entry to the equipment forms a 'U' before its entry to the equipment. Water on the cable will drip down at the bottom of the loop and will not accumulate at the equipment connectors.      Mounting RackMasonry bolt8-M10x110PS BDA8-M4x12, Hex socketwith washer bolt
INSTALLATION GUIDE FOR RX7W22  ENU STATUS : 1-0-0 Copyright - refer to title page Page 17     3.4  EQUIPMENT CONNECTORS 3.4.1  PS BDA CONNECTORS The PS BDA is designed for all cable entries from the right or left of the enclosure, as shown in the following figure.    Figure 6: Equipment Connectors  Table 1: Equipment Connectors Identifier Descriptions Power1 This is a power cable gland for a pre-installed power cord for connection to AC (e.g. AC 100-240V 50Hz/60Hz). DT Test QMA connector for connection to donor antenna test.  MT Test QMA connector for connection to service antenna test. DT N-Female connector for connection to donor antenna.  MT N-Female connector for connection to service antenna.  OMT N-Female connector for OMT connection ALM1 Mini-Din connector for connection to external alarm. ALM2 Mini-Din connector for connection to external alarm. AUX Reserved. LAN RJ45 Connector for internet connection (Ethernet type only).                                                     1 The voltage identification is a variant due to electricity system diversity of global regions. The power cable gland might be identified for AC 110V, AC 220V, AC 110V/220V, or DC -48V respectively. Please refer to specific product or contact local sales if any doubt. DT MTAC 100V-240V  50Hz/60HzAUXPWRALMRUNALM1MT_TESTDT_TESTLANOMTALM2
INSTALLATION GUIDE FOR RX7W22  ENU STATUS : 1-0-0 Copyright - refer to title page Page 18     3.4.2  PS BDA LED INDICATORS The LED indicators helps user to check the equipment status easily.   Table 2: LED Indicators Identifier Colour Indication PWR Green Power indicator. ON = power on; OFF = power off.  RUN Green Operation indicator, flashes every second to indicate normal operation. ALM Red Alarm indicator. ON = alarm; OFF = no alarm.   3.4.3  GROUNDING CONNECTION Ground Connection  To ensure safe operation of the product, a ground (earth) connection is required. For single phase AC power source, the product must be grounded by connecting the “earth wire” of the power cord to the ground terminal of the AC supply. For operating this product with DC power system (such as rectifiers), the product should not be connected to power systems that switch open the return lead because the return lead could function as the ground (earth) connection for the equipment.   Protective Ground Connection  The enclosure must be grounded securely by connecting a copper wire (CSA 16mm2) to the grounding terminal on the equipment/rack, and the other end to a protective ground (i.e. building earth point). An internationally acceptable colour code of the ground connection wire is green/yellow.   Such a ground connection implements the “Protective Ground Connection”, and must be connected to the equipment at the designated ground point. In general, do not connect the supply before establishing an adequate ground (earth) connection.  Construct the ground wire, and use appropriate crimp connectors where necessary. Locate and connect the equipment grounding terminal to a protective ground (i.e. building earth point).  3.4.4  RF CABLE CONNECTION Single band PS BDA RF cables connection is as follows:   PS BDA MT port  Connects to the feeder cable from service antenna.  PS BDA DT port  Connects to the feeder cable from donor antenna.   3.4.5  ETHERNET CONNECTION Connect Ethernet with ‘LAN’ port in the panel, Ethernet type only.
INSTALLATION GUIDE FOR RX7W22  ENU STATUS : 1-0-0 Copyright - refer to title page Page 19     3.4.6  PHYSICAL CONNECTION TO OMT PC  For local commissioning, user can take figure below as a guide to connect the equipment with OMT PC.   Wireless Network/EthernetWireless Build-in WCDMA Modern /Ethernet AdaptorRealize Remote MonitoringLocal MonitoringWireless Modem/EthernetMonitoring Center RJ45 Cable Figure 7: OMT Connection without Opening Chassis   Note: After connection and commissioning, please make sure the water proof for all external connectors.   End of Section  4  COMMISSIONING  4.1 PRE-COMMISSIONING TASKS After equipment installation, perform the following steps before equipment powering and commissioning:   Check the expected voltage, current and power levels do not violate any ratings.   Visually inspect the power connection within the equipment. Ensure that the power cable is correctly and securely connected, including grounding wire, RF cable and other cables.   Check grounding connection and verify that the ground resistance is less than 5Ω.  Test the antenna system and ensure the echo loss within working frequency is less than -14dB (VSWR<1.5).
INSTALLATION GUIDE FOR RX7W22  ENU STATUS : 1-0-0 Copyright - refer to title page Page 20     4.2  COMMISSIONING PROCEDURE Perform the following procedures for system commissioning.  Connect and inquiry statusSet channel No.Input power detection and adjust the direction of Donor AntennaOutput power confirmationDrive test and adjust the direction of Service AntennaAdjust UL ATT and confirm the call quality Double check the status of BTS Uplink and the isolation between Donor Antenna and Service Antenna EndSet monitor parametersIsolation detection
INSTALLATION GUIDE FOR RX7W22  ENU STATUS : 1-0-0 Copyright - refer to title page Page 21     Table 3: Commissioning Task Explanation Commissioning Tasks Observation 1. On-line and Inquiry status  Activate the OMT Main window. The system Initialization will completed in about 2 minutes.   Check the ALM LED for the repeater’s status. Proceed if there is no alarm; else check the failure and attend to the alarm. 2.  Isolation detection  Detect isolation of service antenna and donor antenna. 3.  Set Channel No.   Keep RF switch ON and set the channel number of the repeater’s operating frequency. 4.  Adjust Downlink Output Power and align donor antenna  Observe DL input power from measured value. Align the direction of donor antenna until the DL input power reading is maximized.  Note: To ensure that the measured DL input power is accurate, one should set the DL ATT to “0” before performing the check. 5.  Configure [Device ID]  Go to [Device Info] and set [Device ID]. 6.  Comm. Setting  Go to [Management] -> [Comm. Setting] and select communication types: [SMS], [PS] or [SNMP]. 7.  Select Monitoring Parameters  Select the equipment controlled and monitored parameters.. 8.  Test coverage area field intensity and adjust service antenna.   Use test-handset to verify field intensity within the coverage area. If needed, realign the service antenna to achieve the desired coverage.  Note: If during operation, the equipment gain could not be set to maximum or the output power is not high enough due to insufficient donor and service antennas isolation, then the antennas’ position should be changed to increase isolation. If the output power is too high and ALC is activated, then adjust the DL ATT to achieve optimal DL Gain.  9.  Verify UL gain and ensure test call produces good voice quality and there is no interfering BTS  Adjust UL gain and perform test calls. Typically, the UL gain is set around 5dB less than DL gain. Perform test calls in the coverage area while adjusting UL gain if required.   Note: If the repeater is near the BTS and the test call performance is poor, this may be due to UL noise interference to the BTS. Users can calculate and determine if the repeater UL noise will interfere with the BTS.  Verify again that there is no unacceptable interference to BTS.      End of Section
INSTALLATION GUIDE FOR RX7W22  ENU STATUS : 1-0-0 Copyright - refer to title page Page 22     5  WEB GUI PS BDA can be monitored and controlled by WEB GUI, take descriptions below as a guide to finish system parameter setting and commissioning.    5.1  WEB GUI CONNECTION Step 1: Connect OMT port to PC RJ45 port with the supplied RJ45 cable to set up a physical connection.  Step 2: Open browser (browser IE7.0, IE8.0, Chrome or Firefox, suggest display resolution is 1024×768), input Web GUI IP address: 192.168.8.101, click [Enter].  NOTE: DHCP and DNS are also available to login Web GUI. The domain name is: www.combaomt.com.     Figure 8: Input IP Address    Figure 9: Input Domain Name  Step 3: Input User Name: admin; Password (default password: admin). Click [Log in].   Figure 10: Input User Name and Password
INSTALLATION GUIDE FOR RX7W22  ENU STATUS : 1-0-0 Copyright - refer to title page Page 23     5.2  WEB GUI INTRODUCTION After log in, the Web GUI main screen will appear.   Figure 11: Web GUI Main Screen  On Comba Web GUI Home Screen, there are four Menu bars:  [Devices], [Commissioning], [Firmware] and [Management].  5.2.1  [DEVICES] The [Devices] Screen shows the equipment status, such as PA status, alarm information, etc.   Overview Screen   Figure 12: Overview Screen     Showing basic information of PS BDA Indicating the equipment status Indicating alarm status Click to enable /disable alarm Indicating alarm status Click to enable /disable alarm
INSTALLATION GUIDE FOR RX7W22  ENU STATUS : 1-0-0 Copyright - refer to title page Page 24     800 Screen  This screen is only available for the dual band PS BDA or 800MHz PS BDA.   Figure 13: 800 Screen  700 Screen  This screen is only available for the dual band PS BDA or 700MHz PS BDA.   Figure 14: 700 Screen     Selecting sub band Sub band information Center frequency information Bandwidth  information RFU parameters  Selecting sub band Sub band information Center frequency information Bandwidth  information RFU parameters
INSTALLATION GUIDE FOR RX7W22  ENU STATUS : 1-0-0 Copyright - refer to title page Page 25     5.2.2  [COMMISSIONING] A work flow of the commissioning process is shown on [Commissioning] Screen. Click the [Start] button, the software will guide you through the commissioning step by step. For details, please refer to chapter 5.3.   Figure 15: [Commissioning] Screen   5.2.3  [FIRMWARE] There are two functions on the [Firmware] bar: [upgrade] and [swap]. [Upgrade] is used to upgrade software, and [Swap] is to replace current firmware version to the previous one.  Follow steps shown in below figure to upgrade firmware.                                                 Figure 16: [Firmware] Screen – MCU Firmware Upgrade     Step 1: Click to select the software for upgrading. Step 2: Click to finish the software upgrading.
INSTALLATION GUIDE FOR RX7W22  ENU STATUS : 1-0-0 Copyright - refer to title page Page 26      5.2.4  [MANAGEMENT] Other parameters can be configured on [Management] Screen.   Figure 17: [Management] Screen  There are nine function bars list on the left side of the [Mangement] Screen.    Inport&Export   Figure 18: Management – Import & Export  The parameters that can be import/export include sub band, alarm enable, ATT value, RF switch, DL output power and so on.  This function can help users quickly configure PS BDA parameters. For example, if one PS BDA finished configuration, users can export the parameters and save it as a file in PC, and then import this file to other PS BDA to finish the device parameter setting in an easy way.  Management menu, click to enter each page for parameters setting. Import/export configuration parameters.
INSTALLATION GUIDE FOR RX7W22  ENU STATUS : 1-0-0 Copyright - refer to title page Page 27       IP Setting    Figure 19: Management – IP Setting  Note:  For  remote  monitoring,  IP  Address  must  be  set  correctly  based  on  the  location  IP  of  remote connection. If more than one equipment is connected to the public network through the same router, the router’s local IP CANNOT be set as 192.168.8.*.    Comm. Setting    Figure 20: Management – Comm. Setting   Note: There are 4 communication types: SMS, PS, SNMP and ETHERNET. You can choose a suitable type for remote monitoring.    Configure IP address for remote monitoring.
INSTALLATION GUIDE FOR RX7W22  ENU STATUS : 1-0-0 Copyright - refer to title page Page 28      Maintenance   Figure 21: New Site Report is for easy monitoring set up    Security    Figure 22: Management – Security  Click , [Modify Password] window will pop-up.
INSTALLATION GUIDE FOR RX7W22  ENU STATUS : 1-0-0 Copyright - refer to title page Page 29      Figure 23: Modify Password  Note: Username cannot be modified.    Device Reset   Figure 24: Management – Device Reset Note: Click  , all the parameter and alarm will set to factory default value. Device Reset process will last about 2~4 minutes. For PMU monitor reset, users need to re-login WEB GUI.
INSTALLATION GUIDE FOR RX7W22  ENU STATUS : 1-0-0 Copyright - refer to title page Page 30      Device Info    Figure 25: Management – Device Info  Note: Users can input maximum 30 bytes characters in Device Info.     Isolation    Figure 26: Management – Isolation   Note: This Step is the same as step3 of [Commissioning]. Users can check isolation again by clicking Check button.    Click here to get PC time. Input device information.
INSTALLATION GUIDE FOR RX7W22  ENU STATUS : 1-0-0 Copyright - refer to title page Page 31      Dry Contact  Figure 27: Management-Dry Contact   Test   Figure 28: Management-Test     Step 1: Click the drop down menu to select the desired parameters for dry contact 3 and 4.  Step 2: Click to finish the dry contact setting. Click to start the alarm test.
INSTALLATION GUIDE FOR RX7W22  ENU STATUS : 1-0-0 Copyright - refer to title page Page 32      Report    Figure 29: Management – Report   Note: Click Create to create report (The report can’t create in IE browser.) and make sure the computer has installed PDF Reader software. If no, users will see nothing.    5.3  COMMISSIONING PROCEDURE To complete the installation and commissioning, users need to follow the steps below.   Step 1: Click Menu bar [Commissioning] on home screen, a work flow will show up.   Figure 30: Commissioning Procedure - Start
INSTALLATION GUIDE FOR RX7W22  ENU STATUS : 1-0-0 Copyright - refer to title page Page 33     Step 2: Click   to start the process.   Figure 31: Commissioning Procedure – Site Info. Setting      Step 3: Click , users can set the site information.    Figure 32: Dev Info & Date/Time  Dev Info mainly used to record device location and Date/Time provides a time reference. Click the Config Value of Date/Time, will update Date/time automatically.  NOTE:  Make sure the  device is connected with appropriate donor  and service antennas before proceeding to step 4.   Step 4: Click   to enter to Isolation Detection Screen shown as Figure 52.    Select a frequency band (RFU) that need to commission.   Click   to start Isolation Detecting, then [Confirm] window will pop-up shown as Figure 53.
INSTALLATION GUIDE FOR RX7W22  ENU STATUS : 1-0-0 Copyright - refer to title page Page 34       Click   to continue. If isolation detection success, the process will go to RF Settiing Screen shown as Figure 55. If failed, a Tips window will pop-up shown as Figure 54, users need to check whether the system isolation is very weak.  NOTE: At the end of first frequency band commissioning, user can start other frequency band commission.   Figure 33: Commissioning Procedure – Isolation Detective   Figure 34: Commissioning Procedure – Isolation Detective Confirm    Figure 35: Commissioning Procedure –Isolation Detection Failed
INSTALLATION GUIDE FOR RX7W22  ENU STATUS : 1-0-0 Copyright - refer to title page Page 35                                          Figure 36: Commissioning Procedure –Isolation Detection Finish   Step 5: RF Setting Screen for setting center frequency.    Figure 37: Commissioning Procedure – Center Frequency Setting     Step 1: click to open the parameter setting page. Step 2: input the desired value. Step 3: click to finish the setting.
INSTALLATION GUIDE FOR RX7W22  ENU STATUS : 1-0-0 Copyright - refer to title page Page 36     Step 7: Click    to finish the commissioning.   Figure 38: Commissioning Procedure – Finish     End of Section
INSTALLATION GUIDE FOR RX7W22  ENU STATUS : 1-0-0 Copyright - refer to title page Page 37     6  MAINTENANCE The mBDA is designed for trouble-free operation and generally does not need maintenance. Maintenance activities should only be carried out by trained personnel.  The equipment operation status can be observed remotely through OMC.  Periodic inspection of the repeater equipment(s) is recommended, the recommended tasks includes:    Inspect and record operation status and output power of the repeater from OMC or OMT.   Verify the direction and position of antennas. Re-align if necessary.  Make sure the cable gland and sealing on the RF cable connectors are not damaged.   Verify lightning and grounding protection is in good condition.     End of Section
INSTALLATION GUIDE FOR RX7W22  ENU STATUS : 1-0-0 Copyright - refer to title page Page 38     7  APPENDICES 7.1  APPENDIX A: TOOLS The following are the recommended list of tools for new installation and routine maintenance.    Slotted Screwdriver     Philips Screwdriver     Ring Spanner (Assorted size: 12~20mm)    Electrically operated drill and masonry drill bits 12mm   Anti-static Wrist Strap     Pentagon Allen Key    Side Cutter   Frequency Counter (e.g. FLUKE PM6685R)   RF Power Meter (e.g. Bird 5000)
INSTALLATION GUIDE FOR RX7W22  ENU STATUS : 1-0-0 Copyright - refer to title page Page 39     7.2  APPENDIX B: RMA (RETURN MATERIAL AUTHORIZATION) FORM   End of Section  End of Document
INSTALLATION GUIDE FOR RX7W22  ENU STATUS : 1-0-0 Copyright - refer to title page Page 40