Baicells Technologies BRU3501 LTE-TDD Base Station User Manual Nova 243 Outdoor LTE TDD Base Station

Baicells Technologies Co., Ltd. LTE-TDD Base Station Nova 243 Outdoor LTE TDD Base Station

User manual

  03  All rights reserved © Baicells Technologies Co., Ltd.   Nova-243  Outdoor  LTE  TDD  Base  Station Installation Guide
Nova-243 Outdoor LTE TDD Base Station Installation Guide  About This Document This  document  is  a  guidance  of  Nova-243  hardware  installation  for  installation personnel, including the  preparation  of  installation tools and  supporting materials, the demands  for  installation  environment,  installation  procedure,  cable  connection and power on. Accomplish  the  installation  of  the  device  according  to  this  guide,  the  installation personnel can avoid potential damage to the device during the installation procedure, which makes sure the subsequent good running of the device.   This document suit for the models of BRU35xx series base station. Copyright Notice Baicells copyrights this specification. No part of this specification may be reproduced in any form or means, without the prior written consent of Baicells. Disclaimer This  specification  is  preliminary  and  is  subject  to  change  at  any  time  without  notice. Baicells assumes no responsibility for any errors contained herein. For more information, please consult our technical engineers. Disposal of Electronic and Electrical Waste Pursuant to the WEEE EU Directive, electronic and electrical waste must not be  disposed  of  with  unsorted  waste.  Please  contact  your  local  recycling authority for disposal of this product.  Exclamation Mark According to Article 10 (10) of Directive 2014/53/EU, the packaging shows that this radio equipment will be subject to some restrictions when placed on the market
Nova-243 Outdoor LTE TDD Base Station Installation Guide  Revision Record Date Version Description 10 Aug, 2016 01 Initial Released. 16 Jan, 2018 02 Optimize descriptions and fix some bugs. 4 Apr, 2018 03 Fix bugs.  Contact Us Baicells Technologies Co., Ltd.   Address: 3F, Bldg A, No.1 Kai Tuo Rd., Haidian Dist., Beijing, PR China, 100085 E-mail: support_cn@baicells.com/support_na@baicells.com Tel: 400-612-0167 Fax: +86-10-62607100 Website: http://www.baicells.com/
Nova-243 Outdoor LTE TDD Base Station Installation Guide  Table of Contents 1. Product Overview ......................................................................................................... 1  Introduction ........................................................................................................... 1 1.1 Features ................................................................................................................. 1 1.2 Appearance ............................................................................................................ 2 1.3 Technical Specification ........................................................................................... 3 1.41.4.1 Hardware Specification ................................................................................... 3 1.4.2 Software Specification ..................................................................................... 4 1.4.3 Environment Specification ............................................................................... 5 2. Installation Preparation .............................................................................................. 6  Supporting Materials ............................................................................................ 6 2.1 Installation Tools .................................................................................................. 6 2.2 Installation Environment ........................................................................................ 7 2.32.3.1 Locational Requirements ................................................................................. 7 2.3.2 Environmental Requirements .......................................................................... 7 2.3.3 Power Requirements ....................................................................................... 7  Personnel Requirements......................................................................................... 7 2.4 Against Lightening and Grounding Protection ......................................................... 8 2.5 Weatherproof Protection ....................................................................................... 8 2.63. Install the Base Station .............................................................................................. 9  Unpacking ............................................................................................................. 9 3.1 Installation Procedure .......................................................................................... 9 3.2 Install GPS Antenna ................................................................................................ 9 3.3 Install on Pole ....................................................................................................... 10 3.4 Install on Wall ....................................................................................................... 12 3.5 Connect Cable ...................................................................................................... 13 3.63.6.1 Requirement for Cable Laying ....................................................................... 13 3.6.2 Connect GPS Antenna ................................................................................... 14
Nova-243 Outdoor LTE TDD Base Station Installation Guide  3.6.3 Connect RF Cable .......................................................................................... 14 3.6.4 Connect Ethernet Cable................................................................................. 14 3.6.5 Connect Power Connector ............................................................................. 14 3.6.6 Connect Ground Cable .................................................................................. 16  Install Antenna Feeder System.............................................................................. 17 3.73.7.1 Install Omnidirectional Antennas................................................................... 17 3.7.2 Install Directional Antennas ........................................................................... 18 4. Power On ................................................................................................................... 20  Additional Information............................................................................... 21 Appendix AA.1 Antenna Information ............................................................................................ 21 A.2 Regulatory Compliance ........................................................................................ 21
Nova-243 Outdoor LTE TDD Base Station Installation Guide  List of Figures Figure 1-1 Nova-243 Appearance ................................................................................ 2 Figure 1-2 Nova-243 Interfaces and Indicators ............................................................ 2 Figure 3-1 Installation Procedure of Nova-243 ............................................................ 9 Figure 3-2 Install the GPS Antenna ............................................................................ 10 Figure 3-3 Pre-assembled bracket ............................................................................. 10 Figure 3-4 Location of Grounding Screws ................................................................. 16 Figure 3-5 Omnidirectional Antenna Installation (1) ................................................... 17 Figure 3-6 Omnidirectional Antenna Installation (2) ................................................... 18 Figure 3-7 Assembling Procedure of Directional Antennas ....................................... 18 Figure 3-8 Transportation the Antennas in the Height ............................................... 19 Figure 3-9 Directional Antenna Installation ................................................................ 19 Figure 4-1 LED Indicators .......................................................................................... 20  List of Tables Table 1-1 Nova-243 Interface Description .................................................................... 3 Table 1-2 Nova-243 Interface Indicators ...................................................................... 3 Table 2-1 Support Materials ......................................................................................... 6 Table 2-2 Environmental Requirements of the Base Station ....................................... 7 Table 4-1 Nova-243 Indicator Description .................................................................. 20
Nova-243 Outdoor LTE TDD Base Station Installation Guide 1  1. Product Overview  Introduction 1.1Baicells Nova-243 is high performance outdoor micro base station based on LTE TDD technology,  which  is  developed  by  Baicells.  The  Nova-243  supports  wired  backhaul connections  to  backbone  networks,  and  provides  LTE  access  to  user  terminals, implemented voice and data service transmissions. The  Nova-243  makes  use  of  the  current  transmission  resources  to  reduce  the operator’s investment, and implement the low-cost construction of LTE networks, providing high-speed broadband access for subscribers. The  Nova-243  can  be  widely  used  by  telecom  operators,  broadband  operators, enterprises, government, police security, and so on.  Features 1.2  Adopt the integration design of baseband and RF.   Based on 3GPP international standard LTE-TDD technology; provide high speed data service; support peak rate of DL: 110Mbit/s, UL: 14Mbit/s with 20MHz spectrum.   Support flexible uplink and downlink time slot ratio: 1(2:2), 2(1:3), and high speed data transmission.   Support 5MHz/10MHz/15MHz/20MHz operation bandwidth.   Support copper (RJ-45) and optical port backhaul, flexible to deploy.   Security  services  to  provide  timely  protection  against  potential  security  risks  and illegal intrusion.   Support simple and convenient local and remote web management.   Integration  as  required,  easy  to  installation  and  deployment,  accurate coverage and improved network capacity.   Support network management functions, which includes the management, monitoring and maintenance.
Nova-243 Outdoor LTE TDD Base Station Installation Guide 2   Appearance 1.3The Nova-243 base station appearance is shown in Figure 1-1. Figure 1-1 Nova-243 Appearance   The Nova-243 interfaces and indicators are shown in Figure 1-2. Figure 1-2 Nova-243 Interfaces and Indicators
Nova-243 Outdoor LTE TDD Base Station Installation Guide 3  The Nova-243 interfaces are described in Table 1-1. Table 1-1 Nova-243 Interface Description Interface Name Description ETH0 RJ-45  electronic  interface,  support  10M/100M/1000M self-adaptation, external transmission network. ETH1 RJ-45 electric interface, used for debugging. SNF External Sniffer, Type N interface ANT0 External antenna 1,Type N interface ANT1 External antenna 2,Type N interface GPS External GPS antenna, Type N interface PWR Power interface: -48V DC (-36V~-60V)  The Nova-243 interface indicators are described in Table 1-2. Table 1-2 Nova-243 Interface Indicators Identity Color Status Description RUN Green Fast flash: 0.125s on,0.125s off The board is loading. Slow flash: 1s on,1s off The board is normal. OFF No power input or board fault ALM Red Steady On Hardware alarm, e.g. VSWR alarm OFF No alarm ACT Green Steady On The cell has been activated. OFF The cell has not been activated. VSWR Red OFF The standing wave is normal. Steady On The standing wave is large than normal.   Technical Specification 1.41.4.1 Hardware Specification Item Description LTE Mode LTE TDD LTE Bands BRU3501: 3650MHz~3700MHz for FCC application 3550MHz~3700MHz for IC application BRU3508: 2300MHz~2370MHz BRU3509: 2300MHz~2320MHz
Nova-243 Outdoor LTE TDD Base Station Installation Guide 4  Item Description BRU3510: 2496MHz~2690MHz / 2570MHz~2620MHz BRU3511: 3400MHz~3600MHz BRU3516: 2575MHz~2640MHz BRU3524: 2300MHz~2400MHz BRU3527: 3439.5MHz~3539.5MHz BRU3528: 2570MHz~2620MHz Channel Bandwidth* 5/10/15/20 MHz   MAX Output Power 40dBm/Ant Receive Sensitivity -101 dBm @band42/48 -102 dBm @band38/40/41 Synchronization   GPS, 1588 V2 Backhaul 1 RJ-45 Ethernet interface (1 GE) MIMO DL 2 x 2 Dimension 440mm (H) x 240mm (W) x 140mm (D) Installation Type Pole, wall Antenna External high gain antenna Overall Power < 160 W Power 48V DC, AC adaptor (multi-national standards) Weight About 12 kg  Note: The test method of receiving sensitivity is proposed by the 3GPP TS 36.104, which is based on 5MHz bandwidth, FRC A1-3 in Annex A.1 (QPSK,R=1/3,25RB) standard. 1.4.2 Software Specification Item Description LTE Standard 3GPP Release 9 Maximum Throughput   20 MHz: SA1: DL 80 Mbps, UL 28 Mbps SA2: DL 110 Mbps, UL 14 Mbps   10MHz: SA1: DL 40 Mbps, UL 14 Mbps SA2: DL 55 Mbps, UL 7 Mbps Business Capacity 96 concurrent users   Qos Control   3GPP standard QCI Modulation Mode UL: QPSK, 16QAM, 64QAM   DL: QPSK, 16QAM, 64QAM Voice Solution CSFB, VoLTE, eSRVCC Traffic Offload LIPA (Local IP Access)
Nova-243 Outdoor LTE TDD Base Station Installation Guide 5  Item Description SIPTO (Selected IP Traffic Offload) SON Automatic setup ANR (Automatic Neighbor Relation) PCI confliction detection Spectrum Scanning Supported UL Interference Detection Supported RAN Sharing Supported Network Management Interface TR069 MTBF ≥ 150000 hours MTTR ≤ 1 hour Maintenance Support  remote/local  maintenance,  based  on  SSH protocol Support remote maintenance Support online status management Support performance statistics Support failure management Support configuration management Support local or remote software upgrading and loading Support log Support connectivity diagnosis Support automatic start and configuration Support alarm reporting Support KPI Recording Support user information tracing Support signaling trace  1.4.3 Environment Specification Item Description Operating Temperature -40°C to 55°C Storage Temperature -45°C to 70°C Humidity 5% to 95%   Atmospheric Pressure 70kPa to 106kPa Ingress Protection Rating IP66 Power interface Lightning Protection Differential mode: ±10 KA   Common mode: ±20 KA
Nova-243 Outdoor LTE TDD Base Station Installation Guide 6  2. Installation Preparation  Supporting Materials 2.1Prepare the following support materials accordingly, as given in Table 2-1. Table 2-1 Support Materials Item Description Power cable < AWG16 e.g. AWG14 Shorter than 100m Power plug The power plug connecting to the electricity supply. Antenna RF cable 50 ohm feeder Ethernet cable Outdoor CAT6 Shorter than 100m Antenna Omnidirectional, or directional antenna Ground cable 16mm² yellow-green wire   Installation Tools 2.2The following tools are needed during the installation.               Level bar Marking pen Knife Vise Wrench            Percussion drill and some drill heads hammer Cross screwdriver Cable vise Tape measure      5mm L-shape allen wrench Ladder
Nova-243 Outdoor LTE TDD Base Station Installation Guide 7   Installation Environment 2.32.3.1 Locational Requirements Environments  with  high-temperatures,  harmful  gases,  unstable  voltages,  volatile vibrations, loud noises, flames, explosives, and electromagnetic interference (large radar stations, transmitting stations, transformer substations) are not suitable for the operation of Nova-243, and thus should be avoided.   Places prone to have impounded water, soaking, leakage, or condensation, should also be avoided.   Factors like climate, hydrology, geology,  earthquake, electric power, and transportation should be taken into consideration in the construction process so that a proper location can be chosen to meet the communication engineering environmental requirements, as well as the technical requirements of network planning and communication equipment. 2.3.2 Environmental Requirements Table 2-2 gives the base station’s environmental requirements on temperature, humidity, and voltage.   Table 2-2 Environmental Requirements of the Base Station Item Range Typical value Temperature -40°C  to 55°C  25°C  Relative humidity (no condensation) 0% to 100% 5% to 95% Safety voltage 42 V to 58 V 48 V  2.3.3 Power Requirements Nova-243 TDD base station adopts -48V DC power supply. For the safety and reliability of device, we have the following suggestions.   Remote DC power supply, in general, AC power supply is 100V ~ 270V, the distance of AC power supply to the device is less than 30 meters.   If the static exceeds a certain range, it will lead to great damage to the circuit and the whole device.  Personnel Requirements 2.4The installation personnel must master the basic safe operation knowledge, through the
Nova-243 Outdoor LTE TDD Base Station Installation Guide 8  training, and having the corresponding qualifications.  Against Lightening and Grounding Protection 2.5CAUTION: It  is  unlikely  to  happen  but  since  the  LTE  base  station  is  very  sophisticated equipment so we would recommend you  to  test  it on  the ground to  make sure everything is functioning before install on the tower. The  operator  must  prepare  external  against  lightning  protector  to  protect  the  GPS, external antenna and RJ-45 port. Grounding Notes:   The ground wire adopts yellow-green wire that is no smaller than 16 mm².   Grounding principle: as near as possible.   The base station connects to the reliable outdoor grounding point (earth) through one ground screw.  The  connection  of  the  grounding  points  and  the  ground  bar  need to  be  tight  and reliable. Rustproofing the terminals is required. This can be done with rust preventing paint, anti-oxidation coatings, grease, etc.  Weatherproof Protection 2.6The Nova-243 adopts cold shrink tube for weatherproof protection. Before installing the cold shrink tube, clean up the interface first. The weatherproof protection steps are as follows: 1.  Insert cable into cold shrink tube. 2.  Tighten the connector. 3.  Push the cold shrink tube to the top joint and pull out the strip. 4.  Check whether the cold shrink tube tight connect with the connection.
Nova-243 Outdoor LTE TDD Base Station Installation Guide 9  3. Install the Base Station  Unpacking 3.1Before opening the box, make sure the package is in good condition, undamaged and not wet. During the unpacking, avoid potential damaging impacts from hits or excessive force.   Once unpacked, check whether the quantity are consistent with the packing list.  Installation Procedure 3.2The installation procedure of Nova-243 is given in Figure 3-1. Figure 3-1 Installation Procedure of Nova-243   Install GPS Antenna 3.3Installation requirements on the GPS antenna:   No  major  blocking  from  buildings  in  the  vicinity.  Keep  the  rooftop  buildings  a distance away from the GPS. Make sure the space atop within 90 degrees (at least 45 degrees) is not blocked by any buildings.       Avoid  installing  the  GPS  in  the  vicinity  of  any  other  transmitting  and  receiving devices. Avoid interference from other transmitting antennas to the GPS antennas.   Should be installed within 45 degrees to the lightning rod.
Nova-243 Outdoor LTE TDD Base Station Installation Guide 10    The GPS cable should be as shorter as possible to reduce the influence to signal strength. The GPS has been assembled before packing, the only installation step is to fix the GPS mounting bracket on the base station using the M4 x 14 screws, as shown in Figure 3-2. Figure 3-2 Install the GPS Antenna   Install on Pole 3.4Required  diameter  of  the  pole:  30mm ~  100mm  and  suggest  the  installation  height higher than 120cm. The mount bracket has been assembled before packing, as shown in Figure 3-3. The installation personnel only need to fix the assembled base station on the pole. Figure 3-3 Pre-assembled bracket  1.  Take down the two outer omegas.
Nova-243 Outdoor LTE TDD Base Station Installation Guide 11   2. Make sure the base station’s installation height, fit the thread rod of the assembled bracket to the pole, and then pass the two omegas through the threaded rods, and fasten the four flat gaskets, four spring gaskets, and four nuts.     3.  Mount the base station vertically on the bracket and tighten M6 screw on the top of bracket using cross screwdriver to complete the installation.
Nova-243 Outdoor LTE TDD Base Station Installation Guide 12     Install on Wall 3.5The wall must bear four times of the base station’s weight. 1.  Take apart the assembled bracket. 2.  Install three mounting hooks on the base station with M6 x 16 screws.  3.  Fit the base station with hooks on the wall, and mark the drilling locations.
Nova-243 Outdoor LTE TDD Base Station Installation Guide 13   4.  Drill  three  12mm  diameter  holes  in  the  wall  on  the  marked  locations,  and insert the expansion pipes. 5.  Fix base station to the wall with M8 x 80 expansion bolts.    Connect Cable 3.63.6.1 Requirement for Cable Laying General requirements:   Bending radius requirement of feeder cable: 7/8” > 250mm, 4/5” > 380mm.     Bending radius requirement of jumper cable: 1/4” > 35mm,1/2” (super soft) > 50mm,1/2” (ordinary)>127mm.   Bending radius requirement of power cable and grounding cable: > tripled of the diameter of cable.   Binding the cables according the type of the cable, the intertwining and crossing is forbidden.   The label should be paste after the cable laying. Grounding laying requirement:   The grounding cable must connect to the grounding point.   The grounding cable must be separate with the signal cables, remaining a certain distance to avoid the interruption of signal.
Nova-243 Outdoor LTE TDD Base Station Installation Guide 14  3.6.2 Connect GPS Antenna 1.  Insert GPS jumper into cold shrink tube. 2.  Connect one end of the GPS jumper to the GPS antenna.   3.  Push the cold shrink tube to the top joint and pull out the strip. 4. Connect the  other end  of  the GPS  jumper to  GPS  interface of the base station, which also need weatherproof protection. 3.6.3 Connect RF Cable 1.  Open the dust cap of ANT0 and ANT1 interface. 2.  Insert RF cables into cold shrink tube. 3.  Connect one end of the two RF cables to ANT0 and ANT1 interface of the base station and tighten them with wrench. 4.  Push the cold shrink tube to the top joint and pull out the strip. 5.  Connect the other end of the RF cables to the external antenna, which also need weatherproof protection. 3.6.4 Connect Ethernet Cable 1.  Connect the Ethernet cable to ETH0 interface in the wiring cavity. 2.  Lay Ethernet cable along the wire  groove, and stretch out the wiring  cavity from ETH0 hole. 3.6.5 Connect Power Connector Because  it  is  not  sure  that  the  distance  between  the  installation  site  and  the  power supply device, the two ends of power adapter are bare terminal end. The operators need to make power cable according to the actual conditions on installation site, and assemble power plug and power terminal on two ends of power adapter. Strip 12mm insulating layer with wire stripper, which is used for connection to connector. It is recommended that the power cord length is kept below 100m (330 feet). The connection steps of power cable is as follows.   1.  Assemble power plug. The  power  plug  will  be  installed  on  the  end  of  input  direction.  Refer  to  the identification  on  power  plug,  connect  live  wire,  neutral  wire,  and  ground wire  to
Nova-243 Outdoor LTE TDD Base Station Installation Guide 15  corresponding terminals separately, and tighten screws. 2.  Assemble power terminal. The  power  terminal will be  installed  on  the  end  of  output  direction.  Refer  to  the following figure to connect live wire and neutral wire.  3.  Connect the power cable to PWR interface in the wiring cavity.  4.  The power cable lays along the lint slot, and stretch out the wiring cavity from PWR hole. 5.  The input of the power adaptor connects to the outlet.  If the outlet is indoors, place the power adaptor indoors.   If the outlet is outdoors, place the power adaptor in a water proof box. 6.  Connect the grounding point of AC adaptor to the grounding point on installation site.
Nova-243 Outdoor LTE TDD Base Station Installation Guide 16   7.  After the cable connection is complete in the wiring cavity, tighten the screws on the cover to close the wiring cavity using M4 cross screwdriver. 3.6.6 Connect Ground Cable Make the grounding cable according the actual situation of the installation site. The Nova-243 provides two grounding screws, which is located  on the bottom of the base station, as shown in Figure 3-4. Figure 3-4 Location of Grounding Screws   1.  Unscrew  one  grounding  screw,  connect  one  end  of  the  grounding  cable  to  the grounding screw, and fasten it again. 2.  The other end of the ground cable needs to connect to a good grounding point. The connection point can be done with rust preventing paint, anti-oxidation coatings, grease, etc.
Nova-243 Outdoor LTE TDD Base Station Installation Guide 17   Install Antenna Feeder System 3.7There  are  two  kinds  of  outdoor  antennas,  omnidirectional  outdoor  antennas  and directional  outdoor  antennas,  whose  installation  will  be  introduced  in  the  following, respectively. 3.7.1 Install Omnidirectional Antennas One should pay attention to the followings while installing the omnidirectional outdoor antenna:   The  diameter  of  the  pole  for  omnidirectional  outdoor  antennas  is  required  to  be 35mm ~ 50mm. A typical case is to use the 50mm-diameter round-steel-made pole (with details depending on the specific antenna type).   Make sure that the top of pole and the clamp beneath the antenna are at the same level, after installing the omnidirectional outdoor antenna on the pole.   Make sure that the antenna is high enough to meet the coverage requirement, and that the antenna top falls within the 45 degrees safety angle towards the lightening rod, as shown in Figure 3-5. In principle, no lightening rod can be welded to pole (no metal object is allowed within 1m of the horizontal direction of the omnidirectional antennas), when installing the omnidirectional antennas. Instead, an independent lightening rod should be settled between the two poles, where the lightening rod must be high enough to keep all antennas under its protection cover. Figure 3-5 Omnidirectional Antenna Installation (1)  In  case  is  impossible  to  install  an  independent  lightning  rod  due  to  environmental limitations, the installation method shown in Figure 3-6can be used. Be aware that the pole  supporting  the  lightening  rod  should  be  kept  at  least  1m  away  from  the omnidirectional outdoor antennas.
Nova-243 Outdoor LTE TDD Base Station Installation Guide 18  Figure 3-6 Omnidirectional Antenna Installation (2)  3.7.2 Install Directional Antennas   1.  First, assemble the antennas, as shown in Figure 3-7. Figure 3-7 Assembling Procedure of Directional Antennas   2.  To install it on the iron tower, use a pulley to transport the antenna assembled to the platform on the iron tower, as shown in Figure 3-8. Following the safety rules when working at these heights.
Nova-243 Outdoor LTE TDD Base Station Installation Guide 19  Figure 3-8 Transportation the Antennas in the Height   3.  Fix  the  pole  vertically  to  the  ground  or  concrete  pillars  on  the  rooftop  using expansion  screws,  and  fasten  it  with  steel  wires.  Then,  mount  the  directional outdoor antenna onto the pole using the installation rack, as shown in Figure 3-9. Figure 3-9 Directional Antenna Installation  4.  When the base station has been installed in a proper position, connect all the cables and wires. 5.  Run  tests,  then  seal  and  weatherproof  all  the  connections  after  the  testing  has successfully completed. Refer to 2.6 Weatherproof Protection.
Nova-243 Outdoor LTE TDD Base Station Installation Guide 20  4. Power On Power on the Nova-243, and the indicators will light up, as shown in Figure 4-1.   Figure 4-1 LED Indicators   The explanation of the indicator signal is given in Table 4-1. Table 4-1 Nova-243 Indicator Description Identity Color Status Description RUN Green Fast flash: 0.125s on,0.125s off The board is loading. Slow flash: 1s on,1s off The board is normal. OFF No power input or board fault ALM Red Steady On Hardware alarm, e.g. VSWR alarm OFF No alarm ACT Green Steady On The transmitting channel works normally OFF The transmitting channel works abnormally VSWR Red OFF The standing wave is normal. Steady On The standing wave is large than normal.
Nova-243 Outdoor LTE TDD Base Station Installation Guide 21   Additional Information Appendix AOnly apply to model BRU3510. A.1 Antenna Information Following are the list of antennas certified for use. Customers can choose according to use environment of different antenna.   The antenna list is given as follows. Antenna Type Manufacturer Model Number Antenna Max Gain(dBi) External Planar Antenna Dual Pole Baicells Technologies Co., Ltd ANT-2G17-R-65-EDT0 17 External Planar Antenna Dual Pole Baicells Technologies Co., Ltd ANT-2G15-R-65-EDT0 15 External Planar Antenna Dual Pole Baicells Technologies Co., Ltd ANT-2G13-R-65-EDT0 13 External Omnidirectional Antenna Single Pole Baicells Technologies Co., Ltd ANT-2G12-R-65-EDT0 10 External Omnidirectional Antenna Single Pole Baicells Technologies Co., Ltd ANT-2G10-R-65-EDT0 8 External Omnidirectional Antenna Single Pole Baicells Technologies Co., Ltd  ANT-2G8-R-65-EDT0  6 External Omnidirectional Antenna Single Pole Baicells Technologies Co., Ltd  ANT-2G0-R-65-EDT0  0  A.2 Regulatory Compliance FCC Compliance This device complies with part 15 of the FCC Rules. Operation is subject to the following two conditions: (1) This device may not cause harmful interference, and (2) this device must accept any interference received, including interference that may cause undesired operation.
Nova-243 Outdoor LTE TDD Base Station Installation Guide 22  Any  Changes  or  modifications  not  expressly  approved  by  the  party  responsible  for compliance could void the user's authority to operate the equipment. This equipment has been tested and found to comply with the limits for a Class B digital device,  pursuant  to  part  15 of  the  FCC  Rules.  These  limits  are  designed  to  provide reasonable  protection  against  harmful  interference  in  a  residential  installation.  This equipment generates uses and can radiate radio frequency energy and, if not installed and  used in accordance with the instructions, may cause harmful interference to radio communications.  However,  there  is no  guarantee  that  interference  will  not  occur  in  a particular  installation.  If  this  equipment  does  cause  harmful  interference  to  radio  or television reception, which can be determined by turning the equipment off and on, the user  is  encouraged  to  try  to  correct  the  interference  by one or  more  of  the  following measures:   Reorient or relocate the receiving antenna.   Increase the separation between the equipment and receiver.   Connect  the equipment into  an  outlet  on  a  circuit  different from  that  to  which the receiver is connected.   Consult the dealer or an experienced radio/TV technician for help.  Warning: This equipment complies with FCC radiation exposure limits set forth for an uncontrolled environment. This  equipment should be installed  and  operated with minimum distance 30cm between the radiator & your body.  ISEDC Compliance This device complies with Innovation, Science, and Economic Development Canada licence-exempt RSS standard(s).  Operation is subject to the following two conditions: (1) This device may not cause interference, and (2) This device must accept any interference, including interference that may cause undesired operation of the device.  Le présent appareil est conforme aux CNR d' Innovation, Science et Développement économique Canada applicables aux appareils radio exempts de licence. L'exploitation est autorisée aux deux conditions  suivantes:   (1) l'appareil ne doit pas produire de brouillage, et  (2) l'utilisateur de l'appareil doit accepter tout brouillage radioélectrique subi,
Nova-243 Outdoor LTE TDD Base Station Installation Guide 23  même si le brouillage est susceptible d'en compromettre le fonctionnement.  The antenna(s) used for  this transmitter must be installed to provide  a  separation distance of at least 4.5m from all persons and must not be collocated or operating in conjunction with any other antenna or transmitter, End-Users must be provided with transmitter operation conditions for satisfying RF exposure compliance.

Navigation menu