Airspan Networks ASMAX55 Subscriber (terminal) station User Manual DFS Link instruction

Airspan Networks Inc Subscriber (terminal) station DFS Link instruction

Contents

DFS Link instructions

 LINK INSTRUCTION REVISION: A0  --------------------------------------------------------------------------------------- Doc. Link Instruction   Printing Date: 11/05/08  Page 1 of 5     Title:   Link  instructions for   5.6GHz DFS System                   Rev.  ECO No.  Author  Description  Approved By  Valid Date A0   -    Zion L. Release    Reuven B   10/5/08          .
 LINK INSTRUCTION REVISION: A0  --------------------------------------------------------------------------------------- Doc. Link Instruction   Printing Date: 11/05/08  Page 2 of 5    1.  Required equipment •  2* Standard PC included Serial port and LAN port. •  Standard HyperTerminal Application. •  2* SDA 4S. •  P.S 220VAC to 6V DC. •  2* Ethernet cables. •  Crossed RS-232 cables. •  2* Y cable.  2.  Testing Setup 1ProST Setup Figure    •  Connect Y cable between SDA 4S DB-15 connector and MicroMAX DB-15 connector.  •  Connect Serial cable between MicroMAX DB-9 connector and PC 1 Serial port.  •  Connect LAN cable between SDA 4S port 1 and PC 1 LAN port.  •  Connect Y cable between SDA 4S DB-15 connector and ProST DB-15 connector.  •  Connect LAN cable between SDA 4S port 1 and PC 2 LAN port.  2EasyST Setup Figure    •  Connect Y cable between SDA 4S DB-15 connector and MicroMAX DB-15 connector.  •  Connect Serial cable between MicroMAX DB-9 connector and PC 1 Serial port.
 LINK INSTRUCTION REVISION: A0  --------------------------------------------------------------------------------------- Doc. Link Instruction   Printing Date: 11/05/08  Page 3 of 5  •  Connect LAN cable between SDA 4S port 1 and PC 1 LAN port.  •  Connect 6V DC to the EasyST DC connector.  •  Connect LAN cable between EasyST RJ 45 connector and PC 2 LAN port.   Test SetupLink       1Figure  2Figure
 LINK INSTRUCTION REVISION: A0  --------------------------------------------------------------------------------------- Doc. Link Instruction   Printing Date: 11/05/08  Page 4 of 5  3.  Testing process •  Connect to the MicroMAX using serial cable   •  Use a terminal client application with the following parameters:   •  Connect the to electricity (through the SDA)  •  Verify that the following lines appear on your serial connection window(Wait about 1-2 minutes)
 LINK INSTRUCTION REVISION: A0  --------------------------------------------------------------------------------------- Doc. Link Instruction   Printing Date: 11/05/08  Page 5 of 5    •  Through the serial connection type : cmd “showss”     •  Verify you have one SS connected and operational    •  For broadcasting video through Airspan Networks link please refer to the link as a normal bridge (layer 2)  Note: Once the system detects a radar signal it will behave according to the standard and stop transmitting on the channel. A new channel is chosen and a startup scan is initiated on that channel. A report will be sending on the Hyper Terminal Application.   Test Mode Commands  •  Through the serial connection type:  1.  G_DEBUG_DFS_DONT_MOVE=1        //// Do not jump channel  2.  G_DEBUG_DFS_DONT_MOVE=0        ////  jump channel  3.  cmd "setDfsParams av=0"                     //// Disable availability test  4.  cmd "setDfsParams av=1"                      //// Enable availability test  5.  printRf                                                      //// Print RF channel        End Document

Navigation menu